You should know pressure drop before designing equipment 

Process with Pat
Подписаться 21 тыс.
Просмотров 10 тыс.
50% 1

Опубликовано:

 

29 авг 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 18   
@taylorswiftxo6186
@taylorswiftxo6186 3 года назад
01:09 We calculate pressure drops for the equipment we design all the time in college. Wish someone had explained this to me earlier! Thanks Pat!
@ProcesswithPat
@ProcesswithPat 3 года назад
Glad I could help! The other problem I found was that you don't really know what question to ask - like you don't know what you don't know... Subscribe! More to come...
@Kisalay85
@Kisalay85 3 года назад
Amazing video Patryk! Crystal clear explanation!
@ProcesswithPat
@ProcesswithPat 3 года назад
Thanks Kisalay! Hope you're doing well!
@andrewbradfield5500
@andrewbradfield5500 3 года назад
Another amazing video Pat!
@Mlypm
@Mlypm 6 месяцев назад
I wish I found this Channel at the beginning of my plant design. 3 weeks left still so helpful ty!
@vaddihemanth5443
@vaddihemanth5443 5 месяцев назад
Same situation here! Left with less time with my project.
@robertbradfield8656
@robertbradfield8656 3 года назад
This makes a lot of sense, love it! 👏 Stoked for more content
@davidacosta1950
@davidacosta1950 3 года назад
Amazing! Waiting for more videos!
@timothyulrich395
@timothyulrich395 5 месяцев назад
So simple and helpful!
@petarbabic9409
@petarbabic9409 10 месяцев назад
Amazing videos, really enjoy your work.
@shafikabrahams9786
@shafikabrahams9786 3 года назад
Learnt something today. Thanks
@josipbarun6751
@josipbarun6751 3 года назад
Thank you, more videos please!
@ProcesswithPat
@ProcesswithPat 3 года назад
Absolutely...
@rasmussverdrup7479
@rasmussverdrup7479 3 года назад
Great explanation!
@ProcesswithPat
@ProcesswithPat 3 года назад
Honoured by your presence! Even the experts need a refresher, huh?
@hugodevin8570
@hugodevin8570 11 месяцев назад
Hi Pat, Great video, thanks ! But how is the pressure drop budget chosen when the PFD is made ? On which criteria ?
@NikolayBychkovRus
@NikolayBychkovRus 9 месяцев назад
Hi, Hugo. I am not Pat, but I can answer- it depends on pump and pipelines of the system. And that part vary on size and cost (and history, if it is brownfield).
Далее
Stop looking at pressure drop like this
7:43
Просмотров 2,9 тыс.
Flow and Pressure in Pipes Explained
12:42
Просмотров 1 млн
НЕ ИГРАЙ В ЭТУ ИГРУ! 😂 #Shorts
00:28
Просмотров 287 тыс.
SIGMA ENVY IS UNTOUCHABLE 🔥 #insideout2
00:10
Просмотров 4 млн
娜美这是在浪费食物 #路飞#海贼王
00:20
Liquid line sizing & pumping downhill
17:48
Просмотров 8 тыс.
Operations vs. Design Work in Chemical Engineering
23:23
Pressure drop (and system curves) in parallel
13:13
Просмотров 13 тыс.
Equal % valves - Part 2 - Why do we use them?
13:06
Просмотров 10 тыс.
Pressure Drops in Series Circuits
5:11
Просмотров 174 тыс.
How fast moving water “defies” gravity
9:53
Просмотров 929 тыс.
Can we use CO₂ in our fridges & AC's?
16:43
Просмотров 4,9 тыс.
System curves with recycle lines
15:46
Просмотров 6 тыс.
НЕ ИГРАЙ В ЭТУ ИГРУ! 😂 #Shorts
00:28
Просмотров 287 тыс.