Тёмный

[2b] Derailment of Local CSX Train in Carlton GA, CSX Abbeville Sub, 05/05/2016 ©mbmars01 

mbmars01
Подписаться 34 тыс.
Просмотров 341 тыс.
50% 1

On May 5th, 2016, at about 1pm, the last of two grain cars of the local train CSX A749 topples over in a curve in Carlton, GA. The train came from the feed mill in Comer GA. The video shows how RJ Corman, a company specialized on derailment operations, secures the car by toppling it to the other side of the track. [© 2016 MBMARS Productions. Exclusive rights for RU-vid channel "mbmars01" only.]

Развлечения

Опубликовано:

 

5 май 2016

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 297   
@bigtruknut
@bigtruknut 8 лет назад
Great videos - no other videos show the informational detail. Keep producing-will keep watching.
@mbmars01
@mbmars01 8 лет назад
+norman mckenzie Thank you very much!
@dnc4410
@dnc4410 8 лет назад
Nice job getting all that great footage. Nothing beats watching how they cleanup a derailment just to get the trains moving back through.
@mbmars01
@mbmars01 8 лет назад
+Darrell Twitty Thank you very much. Being a true railfan, I do not like to see accidents like this, but to watch the cleanup with heavy equipment is indeed very interesting.
@tabithaorr5733
@tabithaorr5733 7 лет назад
I agree
@tabithaorr5733
@tabithaorr5733 7 лет назад
Mic only
@oldtown6240
@oldtown6240 7 лет назад
Thanks! I could watch this all day long. Amazing how many people think they could have done it better. Ha!
@mbmars01
@mbmars01 7 лет назад
Thank you for watching. It was definitely an interesting operation. Given the very limited available space, I also don't think it could have been done better. The goal was to get the car out of the way from the inside of the curve and this they achieved after some trying.
@Mrsnichols1965
@Mrsnichols1965 4 года назад
Check out the link below. In fifteen minutes this crew had the car moved, set aside, and were looking at cleanup. In the video above, it took them an hour to haphazardly handle the same situation. Its worth mentioning, its the same company handling the mess, RJ Corman, using the same type of equipment. ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-H6DkK3CcPK4.html
@geoffreykail9129
@geoffreykail9129 4 года назад
Shows what happens when somebody is raised to his highest level of incompetence. The supervisor knew nothing about leverage or balance. Could have been righted and set on the trucks one end at a time, Destroyed a rail car and kept the line closed longer than necessary. Hope a higher up saw this fiasco.
@michaelgamble296
@michaelgamble296 4 года назад
Judging by RJGorman representative's Gung-Ho approach earlier on using these inadequate Catterpillar 're-railing runabouts' (which had no stabilisers or outriggers to give support) in a railway cutting, I fore-saw what would assuredly happen at 24:14 to that expensive grain car. Aren't they fortunate to be still alive? AND not being required to pay for their incompetence. I agree with all Geoffrey Kail says.
@johnbuffum6135
@johnbuffum6135 4 года назад
I concur. There was the truck, all ready to receive the car, but no, topple it over.
@vince6056
@vince6056 3 года назад
I thought I was the only one that thought they were doing this wrong. Long time to flip one car over
@packfannumber1
@packfannumber1 2 года назад
I work for RJ Corman, Billings Montana division and I can assure you this wasn't our guys decision. We are simply contractors and do what the railroad EIC tells us to do.
@tomp8871
@tomp8871 Год назад
It seems they were trying to move the car across the track without destroying the track. That way once it clears they can let traffic through that has been waiting. All in all, could have just dragged it right across, replaced one section of track, quicker.
@rongeorge2179
@rongeorge2179 4 года назад
Dude, this is a great video!
@mbmars01
@mbmars01 4 года назад
Great you like it!
@notthatdonald1385
@notthatdonald1385 7 лет назад
awesome footage!
@mbmars01
@mbmars01 7 лет назад
Thank you! Glad you like it!
@hlongjr46
@hlongjr46 7 лет назад
Another Great Video. Smyrna, Ga.
@mbmars01
@mbmars01 7 лет назад
Thanks!
@carstenprilow1837
@carstenprilow1837 4 года назад
Great video.
@mbmars01
@mbmars01 4 года назад
Cool, thanks!
@joemorris3389
@joemorris3389 4 года назад
This must've been R J Corman's ( B ) Team AKA the wrecking crew, >Joetrak
@wasted6666
@wasted6666 8 лет назад
Wow that was Really Neat Great Video Thanks
@mbmars01
@mbmars01 8 лет назад
+Brendan Flaherty Nice, thank you!
@drewscheller4956
@drewscheller4956 3 года назад
How do you let it run out of fuel? Someone had some explaining to do
@ucallthatatweet
@ucallthatatweet 4 года назад
I can't even figure out if the derailed car was loaded or empty. I didn't spot grain coming out of it. Does anyone here know?
@Jacobkorowin4014
@Jacobkorowin4014 5 лет назад
Great video. Cool shots. That’s strange for a local train to derail like that.
@mbmars01
@mbmars01 5 лет назад
That was indeed unbelievable. Very strange incident, but it really happened lol
@wadepenley7380
@wadepenley7380 Год назад
It's csx what do you expect 😆. They are just a derailment waiting to happen. I get nervous when I'm railfanning and see anything marked csx.
@BF-qt2wp
@BF-qt2wp Год назад
Awesome video keep up with a great work and be safe out there.
@mbmars01
@mbmars01 Год назад
Cool, thanks a lot.
@slicaltimistic1
@slicaltimistic1 7 лет назад
WOW!!! Talking about a very critical operation.
@W3CRTinWV
@W3CRTinWV 4 года назад
All in all, they did more damage to the car than the derailment did.
@gregjeffcoat4258
@gregjeffcoat4258 3 года назад
New set of wheels.a little Bondo and some paint it'll be good as new.
@cup_and_cone
@cup_and_cone 3 года назад
Car was totalled before they even uprighted it.
@cam545
@cam545 4 года назад
I have gotten to see first hand how good RJ Corman are. Some of our sand cars (Interestingly enough probably either CEFX or SHPX, and built in nearby Paragould, AR by ARI, the car in this video was also manufactured there) derailed and tore up some of our switches. They get shit done and get paid very well to do it. Then a few months later a BNSF we had major flooding and RJ came in and rebuilt miles of main line, it looked like a military operation, 24-7.
@mbmars01
@mbmars01 4 года назад
Yea, I also think they do a great job.
@thunderstormzlightning
@thunderstormzlightning 8 лет назад
great video
@mbmars01
@mbmars01 8 лет назад
+irishmanO1 Thank you!
@williamschlenger1518
@williamschlenger1518 4 года назад
How long a train is too long?
@tony2682
@tony2682 4 года назад
Hi From the UK Love your Vids..and the Info captions...Stay Safe Covids about!!
@mbmars01
@mbmars01 4 года назад
Very cool, thanks very much! Stay safe, too!
@iusetano
@iusetano 8 лет назад
Looks like a tricky location. Excellent video.
@mbmars01
@mbmars01 8 лет назад
+iusetano That's what it is. Thanks!
@danielkennedy1524
@danielkennedy1524 8 лет назад
Nice! very cool!
@mbmars01
@mbmars01 8 лет назад
+Daniel Kennedy Yeah, that was certainly a somewhat special event.
@BillySBC
@BillySBC 2 года назад
It's amazing how much stuff these locomotives can pull.
@mbmars01
@mbmars01 2 года назад
Absolutely. I agree.
@choochoo3985
@choochoo3985 8 лет назад
KEYSTONE COPS WORKING ON THE RAILROAD.
@Talcarnan
@Talcarnan 4 года назад
What i don#t get is why they rolled it over to the other side of the track. Why not just shift it further to the left - or was their intention to attempt to try to get it back onto its bogies ?
@elgamo73
@elgamo73 4 года назад
how good it was specialized staff! I do not want to imagine one that was not .... maybe I would have picked it up faster.
@austinbell9437
@austinbell9437 8 лет назад
Nice catch
@mbmars01
@mbmars01 8 лет назад
Thanks!
@epiccsx
@epiccsx 4 года назад
Was that grain car loaded or empty?
@mbmars01
@mbmars01 4 года назад
It was empty.
@DK-nv9zu
@DK-nv9zu 4 года назад
Which one ran out of fuel? There’s three locomotives on that train. They couldn’t just continue with the other two locomotives?
@bruceperkins7253
@bruceperkins7253 2 года назад
Back in the early '70s, in my Hometown, on a sat. Am, U.P. was kickin' cars off the Mainline onto a siding thru A switch, & four cars derailed. They put them back on the track one at a Time, and after they had that done, which took 4hrs, They would walk down the siding ,& park 'em. Then they Replaced the track on both Sides, including the switch For a total of 7 hrs. And the Boxcars didn't tip over which made the job faster and easier. One of the section men told me that if One or more had tipped over It would have been a lot longer getting the mainline Reopened. I'm from the Pacific Northwest, Western Washington state.
@mbmars01
@mbmars01 2 года назад
Cool story. Thanks for sharing!
@mambosenkoatruaywnn1429
@mambosenkoatruaywnn1429 Год назад
It is very normal for such catastrophes to happen in RAILWAYS, as long as the infrastructure is primitive, and they still use wooden sleepers like in the ancient times.....
@christopherdibble5872
@christopherdibble5872 Год назад
The engineers don't wave from the trains anymore, not like they did back in 1954
@telosfd
@telosfd 4 года назад
The wagon had to be tied from the highest point and lifted so that the balance was stable. Of course, the funnels from below did not allow for proper work. In my opinion they should be removable. Nice video!
@mbmars01
@mbmars01 4 года назад
Good you like the video!
@csxcw44ac
@csxcw44ac 8 лет назад
Great video of quite a rare situation, especially since the train was only two cars long. I know CSX has had a number of derailments (Q401 in DC, etc.) but most of those were due to the train too long and the loaded cars improperly placed throughout the train.
@mbmars01
@mbmars01 8 лет назад
+csxcw44ac Yeah, it seems they had quite some troubles last week. I also still wonder how this could happen here.
@cam545
@cam545 4 года назад
Not as rare as you would think. RJ Corman stays very busy doing this day-in-day-out. Pretty cool video tho
@Mrsnichols1965
@Mrsnichols1965 4 года назад
@@cam545 Of course they do. They turned a 2 hour job into at least 4.
@wadepenley7380
@wadepenley7380 Год назад
Csx a derailment garentee.
@RomeKG471
@RomeKG471 4 года назад
Better to of had the 583's instead of the 572's, That guy didnt know what the hell he was doing twisting and turning on the track!
@taylor11089
@taylor11089 Год назад
One of them was a 583 and the Other was a 572 (RJ Cormans 572’s have 1-2 Extra Counterweights). While having a Pair of 583’s is better than 572’s, it really depends on the situation. You can do a Fair Amount of Work with a Pair of 572’s with the Right Conditions, in fact Many of the Derailment Contractors used 572’s for 60+ Years. Hulcher went to 583’s Only, while RJ Corman still has A LOT of CAT 572’s still around (some of them have been replaced with New Deere 850J/K’s with Midwestern 572’s), they are Nice for for Yard Jobs, ReRails and Rail Car Jobs ETC. They should have had a Cat 977 and Excavator on this Job as well. I’m going to guess that they thought it was a Simple 1 Car Job and a 977 Trackloader and Excavator wasn’t needed. Also with the Limited Working Area, that is where the New Deere 470 Excavator’s with Rotator Booms that RJ Corman has at one of its Divisions would have worked 100x’s Better and would have made Short Work of this Job, putting one at Each End of the Car. This would have been a Better Job for Utilco Railroad Services with their Excavator Booms.
@catman7153
@catman7153 7 лет назад
I agree with some the posters about the organization and time took. The equipment in use seemed very inadequate for the job. I watched a crew set two locos back on the tracks in about 6 hours here in the Midwest. They had brought in two large cranes from Catanni, which just picked them up like they were Lionel locomotives!
@catman7153
@catman7153 7 лет назад
I forgot to mention the locos were on their sides...
@mbmars01
@mbmars01 7 лет назад
Well, it's not only the time it took locally. The time it takes to bring in adequate equipment must be added and I think it would have taken considerably longer if they had brought in large cranes (I don't know which would have been the nearest shop that stores such equipment). Plus, there is not much room for large cranes to operate.
@cdavid8139
@cdavid8139 7 лет назад
There are not a lot of companies in North America capable of doing this type of work. The nearest "adequate" equipment could have been too far out to bring in. Sometimes you have to do with what you got.
@haroldsmith8698
@haroldsmith8698 8 лет назад
THERE IS ONE GOOD THING. IT IS GIVING RJ COREMAN SOME WORK TO DO I GUESS IT HAS BEEN SAID THERE HAS GOT TO BE SOME GOOD COME OUT OF EVERY THING
@mantroid
@mantroid 7 лет назад
Thanks for using all caps, as I am hard of hearing.
@flyingfortressrc1794
@flyingfortressrc1794 Год назад
Wow that was crazy to watch.
@StubProductions
@StubProductions 7 лет назад
Great video. This operation is more difficult than the "experts" in their PJs eating their milk and cookies thinks it is. Gotta love arm chair quarter backs.
@mbmars01
@mbmars01 7 лет назад
I agree. It's not a toy car...
@bruceamitchell
@bruceamitchell 6 лет назад
Yes, and they had to do it without damaging the line. Armchairs don't see that.
@fluffnose3386
@fluffnose3386 5 лет назад
Yes...they had lots of train-ing. Heh...heh... (Sorry for existing)
@brianmathias7715
@brianmathias7715 4 года назад
Assuming that those commenting don’t know anything... When they took the chokers over the top to “pull up” from the other side all they did was add down pressure to car while tying to pull it “up” from that position. They needed to attach to the top of the near side of the car, not the bottom of the far side. Same results per say, just a better hook point and less added force. And yes worrying about the rail underneath. The way they hooked it would be trying to “render” the car as it sits instead of “ leaning” the car upright.
@jmannelson8206
@jmannelson8206 4 года назад
Great video as always, not sure why that foreman just didn't hook both cats for a simple roll if all they wanted was to destroy the car. Should have had the tracks clear long before nightfall.
@mbmars01
@mbmars01 4 года назад
Thanks! Yea, the entire procedure looked more complicated than one would think it should be...
@haroldsmith8698
@haroldsmith8698 8 лет назад
WELL THIS IS NEAR CARLTON GEORGIA SHOWED A LITTLE IN A VIDEO WHERE THE TIES HAD NO SPIKES AT ALL; AND THE FAST TRAIN MAY BE THIS ONE. JUST DIDN'T MAKE IT.
@stephenhunter70
@stephenhunter70 8 лет назад
Is it possible that they had the wrong equipment? Have you emailed a copy of this to CSX they might be interested in it?
@mbmars01
@mbmars01 8 лет назад
Well, they have their own people to investigate this incident. For them, it was just a small thing that can happen at any time, I guess.
@WJack97224
@WJack97224 4 года назад
Great video. I always forget what the name of the caterpillars with the side cranes are called. What say you?
@mbmars01
@mbmars01 4 года назад
Thanks! I'm not familiar with this equipment and can't answer your question.
@johnnyholland8765
@johnnyholland8765 4 года назад
@@mbmars01 That is pipe laying equipment converted to that application. Stupidly strong winches on those machines. Tonnage is remarkable. They use one inch diameter cable.
@brianbenson1973
@brianbenson1973 4 года назад
Its called a Sidewinder or Sideboom. It's a Dozer with a hinged boom on one side and a hinged counter weight on the opposite, and winch spool in the back.( no blade up front) Johnny Holland is correct. It was originally designed for laying pipe. Only reason I know what it is, is because I'm a Heavy equipment operator. Lol The Dozer might not of been completely out of fuel, but maybe just low, and with the steep angle of the ballast/ track/ road bed that the Dozer Operator had to climb over to get to the other side probably made the fuel pump suck air on which ever low side of the tank the pump was getting the fuel from? Maybe not, but I've seen it happen before.
@WJack97224
@WJack97224 4 года назад
@@@brianbenson1973, Thank you Brian. That was the name alright! Good on ya mate.
@brianbenson1973
@brianbenson1973 4 года назад
@@WJack97224 You bet buddy!👍😎
@williamschlenger1518
@williamschlenger1518 4 года назад
Dangerous job.
@gregblanton9386
@gregblanton9386 Год назад
This must be the Z Crew for Roger Corman, only one car laid on its side and couldn't get the job done, pitiful.
@HappyHands.
@HappyHands. 4 года назад
R.J Corman... where have i heard that name before... OH that right just about anywhere railroads are LOL
@58jennypenny
@58jennypenny 4 года назад
that guy lying on the track was sending my anxiety through the roof..
@mbmars01
@mbmars01 4 года назад
I remember I thought the same when I watched it live.
@donconklin1770
@donconklin1770 8 лет назад
Nice work; I bet this took a while to completely clean up
@mbmars01
@mbmars01 8 лет назад
+Donald Conklin It's already done. Took less than two days and the line was never closed.
@donconklin1770
@donconklin1770 8 лет назад
+mbmars01 I see. Nice job by the crew!
@haroldsmith8698
@haroldsmith8698 8 лет назад
WHAT CAN YOU EXPECT WITH THE SHAPE THE RAIL TRACK ARE IN WELL RJ CORMANWILL GET IT OFF THE ROAD SO THEY CAN GET THE TRAINS THROUGH.
@kylesnider1784
@kylesnider1784 5 лет назад
3:41 anyone else see that crossing turn off???
@epiccsx
@epiccsx 4 года назад
Yes, it did! lol
@fhbkx
@fhbkx 4 года назад
The video shows how RJ Corman, a company specialized on derailment operations, secures the car by toppling it to the other side of the track! Sooo, they had no intention of re-railing it?
@mbmars01
@mbmars01 4 года назад
Not initially. They just wanted to get it out of the way to re-open the line. The car was put back on tracks the following day.
@AndreiTupolev
@AndreiTupolev 8 лет назад
All those stationary trains must have been blocking dozens of crossings. Did people have alternative ways of getting where they wanted to while all that was going on? Very interesting up close look at the work; was that car loaded or empty?You need to have confidence in your colleagues to lie underneath that car at that precarious angle.
@mbmars01
@mbmars01 8 лет назад
Well, it's possible to go around, but extra ways can be a few miles longer. I think the car was empty, someone who lives there said it was half-loaded, whatever this means. Absolutely right! That wouldn't be a job for me lol
@kempmt1
@kempmt1 Год назад
These workers must be paid big serious bucks to do this job. Is there ways the train engineers know when one or more of the cars derailed?
@austinbell9437
@austinbell9437 8 лет назад
The video you just uploaded it said it have Benin removed
@mbmars01
@mbmars01 8 лет назад
I don't understand.
@dannygayler90
@dannygayler90 7 лет назад
Good Stuff !
@mbmars01
@mbmars01 7 лет назад
Thanks!
@MustangsTrainsMowers
@MustangsTrainsMowers 8 лет назад
No wonder my O scale hopper cars have weights in the bottom.
@mbmars01
@mbmars01 8 лет назад
Haha, that's right. Even before this happened, I always thought this covered hopper design may have a flaw lol
@rachealbailey7054
@rachealbailey7054 4 года назад
Awwww... the poor ol car 😥
@Lt-Dan
@Lt-Dan 4 года назад
I guess they did their best. Perhaps it was their first derailment.
@54blewis
@54blewis 4 года назад
Wow,imagine if they were faced with a 20 car derailment...smh the amount of time just to pull it off the tracks
@mbmars01
@mbmars01 4 года назад
Lol, I remember I thought the same when I watched it.
@tm13tube
@tm13tube 4 года назад
That's dangerous job working under a tilted up train car held up by chains.
@Your_local_mig29
@Your_local_mig29 Год назад
I’ve never seen a derailment Irl or the aftermath of one but it looks horrifying I wouldn’t have the guts to go near it in fear of getting crushed
@mbmars01
@mbmars01 Год назад
Yeah, it's awe-inspiring.
@BorisLu
@BorisLu 8 лет назад
You, like us - can not do it qualitatively. Raising one car takes so much time ... and not the equipment ...
@terrywallace8922
@terrywallace8922 Год назад
You can thank parents for the increase in the number of derailment the railroads are having!
@polskigirl8547
@polskigirl8547 Год назад
How so?
@poolem18
@poolem18 2 года назад
Where is part 2?😀.
@mbmars01
@mbmars01 2 года назад
The aftermath can be watched in the video that came out after this one, I guess that would be [2c].
@poolem18
@poolem18 2 года назад
@@mbmars01 cool thanks.😁
@lknanml
@lknanml 5 лет назад
How does a train run out of fuel in this day and age? That has never crossed my mind as a possibility outside of a leak.
@mbmars01
@mbmars01 5 лет назад
I couldn't believe it either when I saw that.
@rozjones4097
@rozjones4097 4 года назад
LKNANML rumour has it they’re still trying to work out who didn’t put enough fuel in
@vince6056
@vince6056 3 года назад
Csx "we move tomorrow" "because we didn't move today" 😝
@MarylandAreaRailfan
@MarylandAreaRailfan 8 лет назад
Cool catch!
@mbmars01
@mbmars01 8 лет назад
+Maryland Area Railfan Thanks!
@MarylandAreaRailfan
@MarylandAreaRailfan 8 лет назад
+mbmars01 No problem!
@stevehewitt4190
@stevehewitt4190 Год назад
Below Geoffrey Kail says it all. Perhaps the supervisor could go into the scrap business because he certainly scrapped that grain car and stay away from the recovery crews because all he did there was make every-one late home.
@mickboakes7023
@mickboakes7023 5 лет назад
Does anybody know what they are doing? Seems an awful lot standing around. Think they are hanging it out for the overtime.
@joelvela4366
@joelvela4366 8 лет назад
a lot of work.
@mbmars01
@mbmars01 8 лет назад
Quite so.
@felixthecleaner8843
@felixthecleaner8843 4 года назад
Dang Bro - that ain't the way to do it - sheesh!
@cup_and_cone
@cup_and_cone 7 лет назад
No wonder railroads are going broke... Trains running out of fuel because no one checked, rail cars derailing on short transfers, crane rigging crews that don't even know the c.o.g. of a car.
@mbmars01
@mbmars01 7 лет назад
There's some truth in it...
@cdavid8139
@cdavid8139 7 лет назад
WTF are you talking about. Railroads in North America are all profitable.
@steelthfighter
@steelthfighter 7 лет назад
+C David check again
@TheNemosdaddy
@TheNemosdaddy 7 лет назад
I work for a class 1. None are anything less than making money hand over fist. I've spent years working with corman. They are the best in the business.
@cdavid8139
@cdavid8139 6 лет назад
No need to check again. Outside of some short line operations here or there (and most of those are healthy) the Class I railroads in North America all make a profit. They are far from going broke.
@spaceboy3101
@spaceboy3101 5 лет назад
9:55 I could've done without seeing this part. Gyrating plumber's crack. o.O
@magicbulletdancers
@magicbulletdancers 4 года назад
Ahhhh you made me go back to look.... Egads lol !
@RailfanJackProductions
@RailfanJackProductions 8 лет назад
@ 13:33 I'd would had a mess in my pants when thing slid back like that
@mbmars01
@mbmars01 8 лет назад
+Jack Prange II Lol, I agree. But he seemed to be a very skilled driver and operator of his Cat.
@spaceboy3101
@spaceboy3101 5 лет назад
haha, yeah, he's probably used to it though.
@spaceboy3101
@spaceboy3101 5 лет назад
....used to sliding, that is, not messing his pants.... lol
@spaceboy3101
@spaceboy3101 5 лет назад
I thought they were trying to get it back on the track? At the end of the vid it completely rolls over to the other side! Were they trying to that? lol
@mbmars01
@mbmars01 5 лет назад
The purpose of this action was to get the car out of the way and re-open the line. They did put the car back on track the next day.
@JOINTBAW
@JOINTBAW 8 лет назад
nice job hope u got the rest of the clean up lol
@mbmars01
@mbmars01 8 лет назад
+zippa .way They haven't yet cleaned up. I wish I could see it, but I may also well miss it. It's not very close to where I live.
@christophercoleman1895
@christophercoleman1895 8 лет назад
+mbmars01 was there anything in those cars ?
@mbmars01
@mbmars01 8 лет назад
christopher coleman No, it was empty. The train came from the feed mill nearby.
@christophercoleman1895
@christophercoleman1895 8 лет назад
mbmars01 oh ok thanks
@ttvdevildog0326
@ttvdevildog0326 4 года назад
How can a train run out of fuel? Aren’t they suppose to communicate with dispatch about stuff like that??
@Tegridyvs
@Tegridyvs 8 лет назад
Speed limit 35, does 50 to stay ahead of the train.
@mbmars01
@mbmars01 8 лет назад
+Adderall vs Haha, that's not true! Q194 slowed down early because he didn't even have an approach signal to the Howie Siding. Believe me, I don't stress the speed limits. There are cops out there everywhere.
@Tegridyvs
@Tegridyvs 8 лет назад
+mbmars01 yea I feel ya they sit and wait 24/7
@GPSRider
@GPSRider 7 лет назад
Just curious, did the Corman crew not mind being filmed or did you have to schmooz them?
@mbmars01
@mbmars01 7 лет назад
No, they didn't mind.
@darkstorminc
@darkstorminc 4 года назад
Sir Topham Hatt is not happy this day, there is too much confusion and delay!
@mbmars01
@mbmars01 4 года назад
LOL :)
@TheRantingCabbie
@TheRantingCabbie 3 года назад
5:35 They look a little too close together like they got squished.
@simonvaughan788
@simonvaughan788 4 года назад
Use bigger cranes
@skoko1945
@skoko1945 7 лет назад
@ 24:20 DAMM
@reganrickson795
@reganrickson795 8 лет назад
This is one case where cranes on flatcars could have lifted the derailed car faster. Balancing the Cat on top of the roadbed would not have been necessary. New methods are not always better. Each railroad having its own wrecking crews would cost too much, though, considering how rare derailments have become.I have always felt safer when railfanning on the inside of a curve. Thanks for shattering my sense of security!
@mbmars01
@mbmars01 8 лет назад
+Regan Rickson No doubt you're right, but it would have cost too much time to bring in such equipment I guess. I don't know where they store such stuff in this region, but they considered it obviously more efficient to bring in the Cats on flatbed trucks. Yeah, now that I know what can happen, I always think about it when I'm railfanning.
@cdavid8139
@cdavid8139 6 лет назад
In the long run these 'new methods' are far more efficient. You might indeed point to a derailment here or there that could be better handled in the 'old method'. However, railroads long ago determined it is better to let these contractors pick up wrecks than to use their own forces and equipment.
@robertgift
@robertgift 4 года назад
Looks like supervisor does not understand what to do. I would have laid ties on the rails. Lifthe car and it willevel itself on the ties without damaging the rails. Lift onend and roll truck under. Then lifthe other end.
@bohhica1
@bohhica1 4 года назад
Had 1 job today, that was to make sure there was a least 5,000 gal of fuel on board.
@mbmars01
@mbmars01 4 года назад
Lol, that's at least something and more than many others do right now...
@MrAlan0151
@MrAlan0151 Год назад
Fiasco of incompetence.
@haroldsmith8698
@haroldsmith8698 8 лет назад
THIS IS ABOUT WHAT YOU CAN EXPECT IN GEORGIA THE TIES ON THE RAIL ROAD HAS NO SPIKES AND THOSE ARE TO ROTTEN TO HOLD SPIKES WITH THOSE HIGH SPEED TRAINS.
@cdavid8139
@cdavid8139 6 лет назад
Typical bullshit railfan comment
@genivalalvez5281
@genivalalvez5281 4 года назад
É muito fascinante . É meu lazer de todas as noites .
@davidtyndall9604
@davidtyndall9604 4 года назад
I'm just wondering how many people leaving comments are going to go get a job with the RR so you can show them "how it's done".
@thomasproctor3047
@thomasproctor3047 4 года назад
I have never worked with the RR, but I have worked in heavy industrial maintenance and construction for forty years. I have moved and set big equipment and know that when you are uprighting a piece of equipment that you need to have an attachment on it so when it is at it's apex and starts back down you have control to stop it from rolling completely over. They were short one piece of equipment plus some dunnage for blocking. Just my opinion, not a scientific study.
@davidtyndall8880
@davidtyndall8880 4 года назад
@@thomasproctor3047 Obviously I wasn't there but I suspect that, under the circumstances, they were sent out there to "clear the tracks" as soon as possible. As this happened in a basically rural area I doubt that the heavy "train cranes" were close by.
@kens.3729
@kens.3729 4 года назад
Finally Uprighted only to be turned over again on the other side. 🙄
@mow4ncry
@mow4ncry 7 лет назад
Running out of fuel? how stupid, nice shot of the derailment too don't get to see that all the time.
@mbmars01
@mbmars01 7 лет назад
+mow4ncry Yeah... Difficult to understand.
@billrobinson9704
@billrobinson9704 4 года назад
"Train derailment" is my favorite euphemism. That looks like a train wreck to me.
@polskigirl8547
@polskigirl8547 Год назад
😂😂😂
@bob-bf3ru
@bob-bf3ru 4 года назад
That hopper car ate their lunch
@pomietlo24
@pomietlo24 3 года назад
this was a cluster fuck!
@lathamarea1437
@lathamarea1437 4 года назад
That was painful to watch, I agree, a crane would have lifted it safely...looks like hours wasted and it’s still not upright..
@mbmars01
@mbmars01 4 года назад
I also thought they put this thing back on the rails immediately (they did it much later and the car got towed to Athens - see the follow-up video "[2c] The Day After the Derailment...")
@jijzer4581
@jijzer4581 7 лет назад
Was that the end goal just move the wagon out of the way. Ok job done. But funny normaly in the us the equipment is 3times over sized. Now it was 3times under sized. I understand they could not reach one side of the wagon. That made the job difficult. I think this equipment is only for rerailing wnen a loc or wagon is only of track and not on its side.
@mbmars01
@mbmars01 7 лет назад
Yeah, that had to resume their traffic. So indeed the first goal was to get the car out of the way while it was dark. On the next day, they put it on tracks and moved it to a nearby yard, for repair or scrapping I don't know.
@jijzer4581
@jijzer4581 7 лет назад
mbmars01 nice vid btw
@mbmars01
@mbmars01 7 лет назад
J IJzer Nice, I'm glad you likes it!
@skunkworks2059
@skunkworks2059 4 месяца назад
It’s not interesting to so you driving along. Just show what the title claims.
@mountaincentralelevatorsmore
I don’t know why they still have the a should be L
@tomcander3669
@tomcander3669 4 года назад
This was by far not Corman's best crew!!
@briankeith5437
@briankeith5437 4 года назад
Tom Cander I didn’t understand why didn’t they bring in a boom crane and move it to the side just asking ?
@tomcander3669
@tomcander3669 4 года назад
@@briankeith5437 they will re-rail if possible but first and foremost is getting the rail back in service. Yes, I would have just got it off to the side and moved on.
@mec4705
@mec4705 4 года назад
Not one of Cormans better efforts.
Далее
Changing a Traction Motor on an AC6000
13:59
Просмотров 2,4 млн
Grand Elk railroad rerailing cars
30:12
Просмотров 464 тыс.
CSX Derailment! RJ Corman to the Rescue
8:19
Просмотров 8 тыс.
CSX Train Derailment
29:01
Просмотров 358 тыс.
Working Hard to be Lucky: the R. J. Corman Story
44:50
Просмотров 192 тыс.
Найди Влада на стадионе
0:26
Просмотров 3,9 млн