Тёмный

A short update on where we are at and what's been happening in our 1977 Rival 38 refit. 

Sustainable Sailing
Подписаться 557
Просмотров 97
50% 1

Been busy on the forecabin, foredeck and motor compartment. Full video coming soon. First had to get my laptop repaired (Thanks "Fix my PC" in Bangor), then the hinge on my glasses arm broke. So sunglasses only for a few days.
Two and a half years ago, when we bought Vida, she was in a very tired and damp condition with all original equipment and fittings (much of it not working).
We have removed all the gas, diesel, and paraffin equipment as well as all the plumbing and electrics. We have composting toilets, are installing an electric motor and all electric cooking. We are fitting a huge solar array and probably a wind generator. We have replaced all the windows, removed all the headlining and more. We are replacing all the standing rigging with Dyneema synthetic rigging.
This is the biggest sustainability project of our lives as we prepare for a retirement when we want to cruise the world using zero fossil fuels on a very low budget.
If you would like to support us then please use Ko-Fi to make a donation of any size ko-fi.com/sustainablesailing/
Lots more detail on our blog at sustainablesailing.net/
Visit our shop at sustainablesailing.teemill.com/ for hoodies, t-shirts and bags.
#BoatRefit #sabbatical #forecabin

Опубликовано:

 

31 июл 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 2   
@noraahyhanska1522
@noraahyhanska1522 2 года назад
I’d love to hear how the soft rigging and paraphernalia is doing. Cheers
@SustainableSailing
@SustainableSailing 2 года назад
We haven't done much more yet. Need to finish the forecabin so we can store stuff there which will allow me to move out of the aft cabin to do mizzen mast support and finish the chainplates. But we have realised that we will save a lot of money on boatyard electricity if we get the solar panels sorted. We have found a way to build the stern panels before we put the mizzen mast up. So a few weeks away is the short answer 😁
Далее
Refit progress so far in 2023
10:02
Просмотров 379
Drilling FR4 Stanchion bases
5:46
Просмотров 118
OpenCPN Basics - The FREE Chartplotter Program
26:36
Просмотров 105 тыс.
DIY Dyneema Chainplates, Mizzen Mast Support
25:37
Просмотров 2,9 тыс.
The World In 2030
9:59
Просмотров 301