This is phase by phase of how I remodeled a bathroom with a tile shower.
This had a really small shower in it and in fact I was able to remove some wood free up more space. The owner never really understood why the last guy filled it in the way he did.
You will see a very full floor, this is a small bathroom. And it is in the master bedroom so I had no place for my tools.
List of items completed:
* Remove old shower and install new tile
* Install a grab bar in the shower
* New glass door
* Installed new lights
* Installed new mirror
* Installed tile floor
Notes:
I put blocks in the wall before tiling for the grab bar.
The threads on the new sink drain were really bad so I had to glue it in place to get it to stop leaking.
The floor of the show is fiberglass pre-fab
That is my 12 year old at the time that shot the last part