Thank you so so much. This is a really great video. Can you make one more video to explain the meaning of the circuit brand arrows? Hot Neutral Ground. I have difficulties on understanding it.
So great video. We normally run armored cable from outlets and then gather them to a box close or on the ceiling, and then we run 3/4 emt and keep it as more wire as possible but wont exceed 12. Can you take off EMT and wires by this way? And it looks in your way place 3 wires in 1 emt seems waste lots of space, is'nt it?
I created my length assemblies in the tool chest under branch wiring, but by mistake, I added 10’ on the rise and drop section. Is there a way to remove the 10’ on all my branch wiring assemblies all at once or individually without having to create the assemblies again? Thank you and hopefully someone can help out with this
Thai is awesome ! I have a question : when we at our company run branch, we do it with a scale master and clicker. Everytime we go over a fixture, we hit the clicker , how can I run branch on bluebeam and have it count the fixtures I'm branching together at the same time ? I can't find anything like that?
For branch you can only do the polylengths. If you need the counts for the total branch there is a parenthesis beside it. If you want I do one on one training. Go visit my website at www.triple7electrical.com
Interesting, but I guess Bluebeam is not the ideal tool to perform this manual work. Why not use the counting in AutoCAD or any other Software in which these power layouts were created. It is much faster for the Designer to perform and extract MTO's in it while preparing the layout than doing in later on on the pdf's