Тёмный

CEEN 341 - Lab 4 - Soil Compaction and Proctor Test 

Office Hours
Подписаться 29 тыс.
Просмотров 20 тыс.
50% 1

This brief instructional video by David Anderson covers the Standard and Modified Proctor Tests for analyzing soil compaction.

Опубликовано:

 

18 авг 2020

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 7   
@Jeff-es1yr
@Jeff-es1yr 4 года назад
Great to have new videos! Thank you so much!
@benson7600
@benson7600 3 года назад
Your lab is so squeeky clean.
@Zeko01
@Zeko01 2 месяца назад
How to determine the rate for adding water
@nedisawegoyogya
@nedisawegoyogya 2 года назад
critique from my professor: 1. mix water and soil with gloves. 2. Release the rammer without touching it, to prevent energy inconsistency.
@MartinRodriguez-cu6vl
@MartinRodriguez-cu6vl Год назад
The video was informative, but I found a few mistakes that should be noted. (per ASTM D698) 1. Samples with clay should be allowed to cure for at least 16 hours. 3:16 2. The base plate should have been secured to a rigid foundation, without wobbling/rocking. 3. The soil should have been lightly tampered prior to pounding each layer, so that the material isn't in a fluffy and loose state. 4. When you start pounding each layer, the pattern should be like a "+" for the first 4 blows (left, right, down, up), and then you start going in a circle pattern until you reach 25 blows. 5. The sample should only extend a maximum of 1/4 inch above the top of the mold or it should be discarded. You said 1/2 - 1 inch above the top of the mold. 4:00 💀 6. Before starting the 3rd and final layer, you should trim any excess, loose soil remaining from the 2nd layer that wasn't compacted or that extends above the compacted surface. 7. You only sampled the moisture from a single layer. The preferred method is to use the entire specimen, but you should have used a representative portion that included all 3 layers, per the ASTM.
@TacosMendoza
@TacosMendoza 2 года назад
You are supposed to get the sample from all three layers, not just 1.
@harisabbasi5447
@harisabbasi5447 3 года назад
kindly do the soundness test aggregate also , video of it.
Далее
Идея под заказ😂
00:20
Просмотров 168 тыс.
best way out of the labyrinth🌀🗝️🔝
00:17
Просмотров 2,6 млн
ТЫ С ДРУГОМ В ДЕТСТВЕ😂#shorts
01:00
01  Laboratory Soil Compaction ASTM D698 and D1557
16:51
Soil compaction testing
6:59
Просмотров 230 тыс.
Standard and Modified Proctor
22:37
Просмотров 39 тыс.
ACI Slump Test: ASTM C143 Concrete Slump 2019
2:50
Просмотров 254 тыс.
Proctor Compaction Test
10:35
Просмотров 331 тыс.
Dye Penetration and Visual Inspection Techniques
24:39
CEEN 341 - Lab 9 - Triaxial Shear Test (CU) on Sand
12:26
Идея под заказ😂
00:20
Просмотров 168 тыс.