Тёмный

City of Madison Engineering Division Crews Clear Storm Inlets 

City of Madison Engineering Division
Подписаться 69
Просмотров 1,4 тыс.
50% 1

The City of Madison Engineering Division removes snow from storm inlets when temperatures fluctuate with warmer temperatures.
Clearing inlets is important to prevent potential flooding. The City of Madison has 27,793 inlets in the City’s stormwater sewer system. Each inlet moves water to area waterways, if the inlets are blocked with snow and ice, water can begin to pool in streets and begin ponding or create minor flooding.
The Engineering Division crews will prioritize inlets that are at lower points with an enclosed depression. Crews also respond to calls where water is ponding.

Опубликовано:

 

21 янв 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
The Crazy Engineering of Venice
9:28
Просмотров 4,3 млн
People Having A Bad Day | Funny Fails Compilation
19:59
ВЛАД А4 СКАТИЛСЯ
09:34
Просмотров 519 тыс.
Why Are 96,000,000 Black Balls on This Reservoir?
12:07
The Doomed Cleveland Balloonfest of '86
6:35
Просмотров 11 млн
I Didn't Think We Would Survive... (Epic Storm)
10:10
I Survived... Wisconsin
8:39
Просмотров 11 тыс.
Line Handling Accident Prevention
1:43
Просмотров 35 млн
3000HP TURBINE BOAT STARTUP! LOUD
7:02
Просмотров 1,7 млн
How French Drains Work
16:41
Просмотров 2,1 млн
World's Funniest Engineering Fails
6:05
Просмотров 45 млн
ВЛАД А4 СКАТИЛСЯ
09:34
Просмотров 519 тыс.