Тёмный
No video :(

Discovering the new Albion Yard MSF: Inside the Maintenance Centre of O-Train Lines 2 and 4 

Rail Fans Canada
Подписаться 5 тыс.
Просмотров 7 тыс.
50% 1

On May 16, 2024, Rail Fans Canada got an exclusive tour of Albion Yard, the maintenance and storage facility for Lines 2 (Trillium Line) and 4 (Airport Link) of Ottawa's O-Train Network.
This in-depth video offers a behind-the-scenes look at the cutting-edge facility that services the Stadler FLIRT and Alstom Coradia LINT train fleets, crucial for the seamless operation of these lines. From routine maintenance to advanced wheel machining, Albion Yard is equipped with everything needed to maintain and clean the fleet.
Join us in this video as we explore the facility, get an up-close look at one of the new Stadler FLIRT trainsets, and hear insights on various topics from Michael Morgan, Director of the Rail Construction Program at the City of Ottawa.
Special thanks to TransitNEXT, the City of Ottawa, and OC Transpo for making this visit possible.
Video by Shane Seguin.
---------------
SUPPORT RAIL FANS CANADA - SOUTENEZ RAIL FANS CANADA: www.railfans.c...
---------------
Subscribe to our channel: youtube.railfa...
Join our Discord: discord.railfa...
---------------
Follow us Twitter: twitter.railfa...
Instagram: instagram.rail...
Threads: threads.railfa...

Опубликовано:

 

28 авг 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 20   
@kolejnakolej.1437
@kolejnakolej.1437 28 дней назад
Interesting video.
@MrTynanDraper
@MrTynanDraper 3 месяца назад
Nice inside scoop! Live close to this line and have been very very patiently waiting for it to reopen (over 2 years later than origonal schedule). Really hope we at least see an August open. Im fairly confident this opening is going to go much much better than the line 1 opening and 1st year went.
@RailFansCanada
@RailFansCanada 3 месяца назад
We sure hope so! We are quite fond of the Trillium Line and cannot wait to board those trains once more. The Stadler FLIRT will be an amazing addition and the considerably larger stations will make for a nicer experience throughout! Hopefully we finally get to ride the line before the end of the summer. -David
@Zionprince-i1q
@Zionprince-i1q 2 месяца назад
I saw a stadler flirt at platform 1 when it’s vicoria day
@bencns
@bencns 3 месяца назад
7:11 “OC Blue for seats” looks to me like Deutsche Bahn blue ;)
@RailFansCanada
@RailFansCanada 3 месяца назад
I really tried not to laugh when Michael said that, but yes, nothing more Deutsche Bahn than this seat pattern! At least they are consistent with the Coradia Lint! -David
@vette1
@vette1 3 месяца назад
i wonder if they will electricify the line
@Mathieu-OBrien
@Mathieu-OBrien 3 месяца назад
Let's hope!
@RailFansCanada
@RailFansCanada 3 месяца назад
Plans are in place should an opportunity arise, however, as discussed around 7:30, it's not exactly clear what format it would take. The Stadler FLIRT could be converted to electric operation as they already have an electric drive-train (which is currently powered by diesel), but they could (hypothetically) run on batteries, hydrogen or OCS system should funding and the need arise with slight modifications. It also brings the question of whether or not electrification will be "next step" for Line 2 and 4, or whether double tracking along the entire line (or most of it) to increase frequency might be the better investment. Only time will tell! -David
@vette1
@vette1 3 месяца назад
@@RailFansCanada hopefully they go with overhead wire
@owensiderius4534
@owensiderius4534 3 месяца назад
Please god don't let them use hydrogen or battery electric
@wizardsuth
@wizardsuth 2 месяца назад
@@RailFansCanada Complete double tracking and a catenary system would both require extensive modifications to the tunnel under Dow's Lake.
@hollywoodundead1010
@hollywoodundead1010 3 месяца назад
to bad oc transpo is the worst public transit in Canada source: I use almost everyday
@hollywoodundead1010
@hollywoodundead1010 3 месяца назад
they seem better than the first run of trains tho so that's nicd
@honouraryapple
@honouraryapple 3 месяца назад
Try Halifax transit lol
@StefanBretonFoto
@StefanBretonFoto 3 месяца назад
Do you use all the other transit systems in Canada 'almost everyday' as well?
@hollywoodundead1010
@hollywoodundead1010 3 месяца назад
@StefanBretonFoto why would I lie about how shitty a public transit system is?
@Okanagan48
@Okanagan48 3 месяца назад
Too bad they will never be able to keep it working. The worst designed system in Canada
@RailFansCanada
@RailFansCanada 3 месяца назад
The line originally opened in 2001 and ran till it closed a few years ago without any major issues. As the setup and technology and half of the trains are the ones that were used when it closed , in addition to the various differences to Line 1, the high level of reliability is expected to continue as before.
@mlmielke
@mlmielke 3 месяца назад
Somehow they did for 20 years...
Далее
SIGMA ENVY IS UNTOUCHABLE 🔥 #insideout2
00:10
Просмотров 3,6 млн
The Modern Tram Has Gone Off the Rails.
15:16
Просмотров 519 тыс.
the Blackpool most people don't see!
12:04
Просмотров 1,1 млн
SIGMA ENVY IS UNTOUCHABLE 🔥 #insideout2
00:10
Просмотров 3,6 млн