See how it's done up close in this video that compresses about 1 hour of time to show how an Amtrak work crew uses the P-811 Track Laying System to lift the new track, push the aggregate aside, pull the old wooden ties and place new concrete ties and clip the rail in place all at once with this amazing machinery.
**Watch my video of the Amtrak Undercutter at work: • Gettin It Done: A Look...
***Watch my video of the TLS crew at a different part of the track: • Amtrak P-811 MOW Track... ***
* • Amazing Machines: A Lo... *
**Watch my video of Amtrak locomotives No. 726, an EMD GP38-3 and No. 525, an EMD GP38H-3, with a work train full of concrete ties: • Amtrak Train GP38-3 No... **
Watch my video of a work crew with a tie crane and a tie remover/inserter working on the track: • Amtrak MOW Work Crew C... ****
Watch my video of the concrete tie clip fasteners being aligned by an Amtrak MOW work crew: • Amtrak MOW Work Crew C... ****
Watch my video of the P-811 TLM going through another area on the Harrisburg Line: • Amtrak P-811 MOW Track...
**Watch my video as Brandt R4 Power Unit Hi Rail Truck pulls an Amtrak LORAM ballast train to a stop and blows a warning horn for an approaching Amtrak train: • Amtrak LORAM Work Trai... **
View my videos of the Amtrak locomotives at the front end of this MOW train:
• Amtrak Train GP38-3 No...
• Amtrak LORAM Work Trai...
From Amtrak regarding service on this section of track: "Train service operates normally before 8 a.m. and after 4 p.m., but between those times no Keystone trains are operating on this stretch. Service runs at normal times all day Friday through Sunday. During lunchtime Monday through Thursday, the Pennsylvanian, which operates between Pittsburgh and New York City, goes through - one train in each direction.
While the work is being done, there’s one track out of service but the other track is being used to move the people doing the work. That track is cleared so the Pennsylvanian can run through during the lunch hour and the Keystone can resume normal service after 4 p.m. until the end of the day Monday through Thursday."
View my Amtrak Train Playlist:
• Amtrak Trains
View my full train playlist with dozens of videos on my channel:
• Trains
(Video by Dan’s Cool Videos)
Thanks for watching. If you liked this video, make sure to subscribe for more!

Опубликовано:

 

21 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 13   
@danscoolvideos6024
@danscoolvideos6024 2 месяца назад
The concrete ties are about 1,000 pounds each compared to about 200 for wood ties. Amtrak says the concrete ties in this region are expected to last 60 years compared to 25 years for wood ties. This $122 million project is installing 113,000 concrete ties and cleaning/renewing 226,500 feet of gravel ballast on 43 miles of track between Lancaster and Harrisburg, Pa.
@zascokansasdude
@zascokansasdude 3 месяца назад
I find it fascinating! Thanks for posting!
@danscoolvideos6024
@danscoolvideos6024 2 месяца назад
I find it fascinating also, thanks for watching
@raymondgochenour8725
@raymondgochenour8725 3 месяца назад
That’s neat how old out works joyed the video
@danscoolvideos6024
@danscoolvideos6024 2 месяца назад
Thank you so much...It was worth waiting in the nearly 100 degree heat as the TLM went by
@ronaldrondeau7870
@ronaldrondeau7870 3 месяца назад
thanks great job
@danscoolvideos6024
@danscoolvideos6024 3 месяца назад
Thank you!
@JoeyLovesTrains
@JoeyLovesTrains 3 месяца назад
1:05 that is such an epic noise lol
@danscoolvideos6024
@danscoolvideos6024 3 месяца назад
Reminds me of sound effects from Star Wars
@Repairman87
@Repairman87 3 месяца назад
What are long square metal looking boxes used for at the start of the video?
@danscoolvideos6024
@danscoolvideos6024 2 месяца назад
Those contain the ties - the old wooden ties (about 22) that are removed from the railbed and the new concrete ties to be installed by the TLM. The old wooden ties are grabbed by the gantry and transported to the back of the train to be taken away at the end of the work day. Meanwhile the new concrete ties are continually replenished by the gantry and brought to the conveyer to be installed on the TLM.
@afnDavid
@afnDavid 3 месяца назад
Has Amtrak figured out how to make a profit yet?
Далее
Как не носить с собой вещи
00:31
Просмотров 937 тыс.
WEIRDEST New Locomotive?
10:11
Просмотров 302 тыс.
BRACE FOR IMPACT!  The ZLCTM Broke Down In Fresno
5:42
Просмотров 253 тыс.
Why 2024 Is a BIG Year for Amtrak
15:41
Просмотров 357 тыс.
Как не носить с собой вещи
00:31
Просмотров 937 тыс.