Take a stroll across San Francisco's Golden Gate Bridge with me as we watch up close the assembly/installation of the new "moveable median barrier" (MMB), including the insertion of the final center segment. I have no association with anyone in this project - I have no inside knowledge - so I apologize in advance if there are any technical errors in my narration!
This new Moveable Median Barrier (MMB) system is about 13,340 feet of 12-inch wide and 32-inch high steel clad units filled with high density concrete pinned together to form a semi-rigid median barrier. There are also two barrier transfer machines, aka “zipper” trucks.
This replaces, and is a vast improvement over, the old plastic pylon divider system, which we review for a moment at the beginning of the video.
You can see the Barrier Transfer Machine, that moves the barrier, here:
• Golden Gate Bridge Roa...

Опубликовано:

 

30 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 186   
@iphonedoc
@iphonedoc 8 лет назад
He comments that the bridge has never been shut down for construction. I don't know about that but in the eighties it was shut down for bad weather. There had been mud slides and the highway was closed. But they forgot about the on ramps from the military housing in the Golden Gate Recreation Area called Ft Barry. I lived there and left in the morning to go to work at Letterman Hospital. Our usual exit from Ft Barry through a one way tunnel was closed by a mud slide so I took the other route which was over the top, a scenic windy road. It was open and as I got to the bridge it was completely empty including of course pedestrians. I was the only one on the bridge and as I crossed I heard a reporter in a helicopter report on the radio "It looks like the bridge might be opening. I see a car crossing the bridge." It was me but they weren't opening it until the next day. The best part was even though the bridge was closed, the ticket takers were in the booths to take my ticket. Thanks for this story.
@YourHeartsNotAToy
@YourHeartsNotAToy 5 лет назад
The comment I was looking for! Thanks Martin Nation!
@bluef1sh926
@bluef1sh926 6 лет назад
11:00 a guy with a pry bar was more successful than a forklift. Perfect example of lever simple machine.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Golden Gate Bridge moveable median barrier installation: closeup and narrated. Take a stroll across San Francisco's Golden Gate Bridge with me as we watch up close the assembly/installation of the new "moveable median barrier" (MMB), including the insertion of the final center segment. I have no association with anyone in this project - I have no inside knowledge - so I apologize in advance if there are any technical errors in my narration! This new Moveable Median Barrier (MMB) system is about 13,340 feet of 12-inch wide and 32-inch high steel clad units filled with high density concrete pinned together to form a semi-rigid median barrier. There are also two barrier transfer machines, aka “zipper” trucks. This replaces, and is a vast improvement over, the old plastic pylon divider system, which we review for a moment at the beginning of the video. #goldengatebridge #goldengate #sanfrancisco #sanfranciscobayarea #medianbarrier #ggbridge
@riiwind
@riiwind 7 лет назад
That fork driver is useless.
@jimmiandfunny
@jimmiandfunny 7 лет назад
Nice video! Also I enjoyed the view of Golden Gate Bridge. For long years I (I am German) had a dream to go to USA one day and visit this bridge. Now I have given up the dream due to laws and decrees of your new president. Anyway, nice to watch your country.
@rcraw6424
@rcraw6424 5 лет назад
you should visit California, we love people from all countries
@MrPLC999
@MrPLC999 9 лет назад
The whole engineering problem at the end could have been eliminated if they had started assembling the barrier from the center outwards. Seems like an obvious solution to an obvious problem.
@MarkFunderburk
@MarkFunderburk 9 лет назад
MrPLC999 my thoughts exactly.
@jeffsloop4123
@jeffsloop4123 9 лет назад
MrPLC999 Yup, I was thinking the same. You can still work twice as fast as starting from only one end but you don't have to worry about lining anything up.
@inactive67
@inactive67 9 лет назад
+MrPLC999 The point of the dividers is they are movable to allow more lanes for rush hour. They have those expansion joints every 20 sections or so because if they did not they would not be able to move the divider to the adjoining lane within the length of the buss size equipment used to move the dividers. Google zipper lane divider
@radiorob7543
@radiorob7543 9 лет назад
+Jeff Sloop These are State workers. They don't know what fast means. One of many reasons why California is going broke.
@chrissanders3047
@chrissanders3047 9 лет назад
Nice job overall . I am the manufacturer and I am now wondering why I hired those expensive professional photographers. One minor correction the barriers are 1 M long (3.28 feet) and weigh about 1550 pounds each. Come visit our website at Lindsaytransportationsolutions.com for more technical details.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Chris Sanders Thanks. I'm sure the professionals can do things I can't. I try to make my videos entertaining, sometimes with a "twist" if possible. My advantage over the professionals is that I can throw away the ones that don't work out and nobody ever sees those. Although... next time you have an interesting project in SF, maybe we can work out some sort of access ;) No charge on either side! ;) Thanks for the correction -- unfortunately with RU-vid there's no way to replace or update a video. I can add some annotations with corrections, although annotations don't work in all environments and people turn them off too. I did actually visit your site for my other video about the Road Zipper -- hope I got that one mostly correct. Thanks for the comment, I do appreciate it.
@user-marco-S
@user-marco-S 9 лет назад
Chris Sanders It is a nice solution, these barrier system. But i have a question. In the USA is the imperial system in use, so why are the parts 1 Meter long and not 1 Yard?
@RayTruBOB
@RayTruBOB 9 лет назад
that's some bad forklift driving, it could be done much faster if they get a decent driver... :)
@evanstonbalce9588
@evanstonbalce9588 4 года назад
What really matters is they get the job done
@websitesthatneedanem
@websitesthatneedanem 9 лет назад
Great video! Love your style of commentary!. Your camera is very steady when walking, what camera were you using please?
@busdriverbob8977
@busdriverbob8977 9 лет назад
Your video here just became one of my all time favorites because it falls into ("It's a Small World") category! - Because 2 minutes and 33 seconds into your filming, you captured two Northbound Golden Gate Transit buses crossing the bridge. Bus# 915 was behind #1521 and the driver of #915 was Bus Driver Bob (me) with a camera sitting on the dash capturing the video now on RU-vid under the title (Crossing the "Closed" Golden Gate Bridge during 2015 Construction - Driving Golden Gate Transit) I am going to try to go back and see if I can spot you recording there on the bridge as I rolled by! - I really enjoyed your entire video and saved it to my favorites. I've now Liked & Subscribed to your channel and I'll let people know to check out your video..... What a trip!
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Bus Driver Bob You are quite correct! In today's world, where every event has a million people recording from every angle, it is inevitable that they will each be in each others' video. I did indeed spot myself in your video, but only because I know what I look like -- you can only see me from behind and for a couple of frames and you can't see my camera, so only I know it is me! This is actually not the first time something like this has happened. I often record events in SF, and there are others who do the same and on occasion I have been able to spot myself in the background of one of their videos.I actually thought about taking a GG Transit bus that day, but never got around to it. I did take a Muni 28, but not GG Transit. Occasionally I do drive-lapses and train-lapses, and I've thought about doing bus-lapses -- who knows, maybe we could collaborate on a bus-lapse someday...
@RaymondHng
@RaymondHng 9 лет назад
+Bus Driver Bob: Haha! Same thing happened with a segment I edited of a rally/counterprotest at Portsmouth Square. A second cameraman who was there posted his footage on RU-vid and I found my cameraman captured in the second cameraman's footage. So I went back through my cameraman's footage and found the second cameraman captured in our clips.
@philipp635
@philipp635 8 лет назад
Thats an horrible forklift driver!
@timothyptittle
@timothyptittle 5 лет назад
Philipp no he wasn’t
@evanstonbalce9588
@evanstonbalce9588 4 года назад
Disagree
@nameinvalid69
@nameinvalid69 6 лет назад
very interesting. Really wish such system is used widely and there's option for lower cost version. it's really stupid to see one side of road is full of cars and the other side is completely empty during rush hour. movable barrier is brilliant.
@bg147
@bg147 8 лет назад
Three guys working and another hundred standing around. I couldn't resist.
@g41thomas
@g41thomas 6 лет назад
The first ever that came to operation was utlized in Boston Dorchester Quincy 93 express way in Massachusetts. This type of divider aka "zip line" not only partition the road but also will help to add and change the amount of lines available on each side of the traffic based on time of days and amount of traffic. Very smart solution to help ease the rush hours traffic indeed. Nice video.... Thank you
@Zynyster
@Zynyster 9 лет назад
Very Cool! That was interesting to watch, thank you for sharing.
@MrCowboy1492
@MrCowboy1492 8 лет назад
Why did not they start in the middle and go to the ends...adjustments would have been easier. Also, THANKS for posting, I love watching all sorts of construction. I just wonder what's the bottom made from...dragging it across the lanes won't it tear up the bridge and then they have to close it to repair the damage. Will they paint the steel parts so they don't rust. How long does it take to move the entire barrier. I think someone should climb to the top of one of the towers and base jump with a wing suit....yeeehaaa..Thanks again for posting.
@warrenfowlie1608
@warrenfowlie1608 9 лет назад
Congratulation to the Golden Gate District of Caltrans for the hard grind of over 20 years, to get the barrier onto the bridge. Having worked on the replacement MLB for the Auckland Harbour Bridge here in New Zealand some 5 years ago, I understand the benefit of this important roads safety device. The users of the GG bridge now get the very big benefits of not having to worry about head-on crashes. Need to also say that Barrier Systems; the manufacturer of the system, are a great team of people to work with. Well done to all concerned. Sorry, forgot to mention. HD video is excellent. For being an outsider looking in, coverage was very professional and informative - well done //waf.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Warren Fowlie Thanks, Warren, I appreciate the comment.
@peggyt1243
@peggyt1243 8 лет назад
It is a copy of the Auckland Harbour Bridge in New Zealand which was the FIRST. BELOW IS A DIRECT QUOTE FROM WIKIPEDIA In 1990, a movable concrete safety barrier was put in place to separate traffic heading in opposite directions and eliminate head-on accidents. Two specially designed barrier machines moved the barrier by one lane four times a day,[28] at a speed of 6 km/h. It took 40 minutes to move the barrier, which was the first of its kind in the world. en.wikipedia.org/wiki/Auckland_Harbour_Bridge Yes folks, the USA is 25 years behind New Zealand when it comes to zipper lanes and moveable barrier machines known as road zippers.
@MAVA1686
@MAVA1686 8 лет назад
+peggyt1243 this barrier is of metal not concrete.... soo it is a Movable Steel safety barrier ....and i think it will be more durable ..... if it is a copy I don´t know. and i dont know if you were angry .... XD
@peggyt1243
@peggyt1243 8 лет назад
+ma va My issue is the USA claiming they are first. They are not the first to have a zipper lane.
@MAVA1686
@MAVA1686 8 лет назад
ok . I understand you.
@JonathanRossRogers
@JonathanRossRogers 7 лет назад
Who claimed the Golden Gate movable median barrier was the first one? I heard no such claim in this video. This video starts out saying that people having been talking about putting a movable median barrier on the Golden Gate for many years and that the video is documenting the first time the Golden Gate has had such a barrier. The wording implies movable median barriers have existed elsewhere before.
@firstnamelastname7143
@firstnamelastname7143 8 лет назад
Interesting, @12:38 to 13:24 you can clearly see the end on the right is a special sliding link to allow for adjustment installing the last section. What is the purpose of this being movable, to allow for an extra lane one way in morning traffic to work, then the other way heading home?
@readysetsleep
@readysetsleep 8 лет назад
+firstname lastname Yes switch it to 4 lanes in and 2 lanes out morning rush hour and 4 lanes out and 2 lanes in during evening rush hour. Here in NYC to NJ they use the 4th lane for buses, but they don't have a fancy barrier system. Just the cones and pegs, kind of scary for guys to move them during full traffic.
@judithfenske2311
@judithfenske2311 4 года назад
Military bases and D.C.use the closing of lanes in rush hours. Works very well.
@jeffsloop4123
@jeffsloop4123 9 лет назад
A more skilled forklift driver would go a long ways!
@MAVA1686
@MAVA1686 8 лет назад
I like to see this kind of videos ... i love it because i like to see the constructions and cities around the world.... for myself i can say that i always learn something new. Thank you for sharing.
@idadho
@idadho 8 лет назад
Looks like the Bridge District workers are competing to see which one can do the best impression of a heard of snails.
@Timothy-NH
@Timothy-NH 5 лет назад
Does the narrator normally announce golf matches? LOL
@madkirk7431
@madkirk7431 5 лет назад
9:12 right after he said only busses and construction traffic can go through, a random, low car went through XD
@ganeshrvgk
@ganeshrvgk 6 лет назад
Did any one calculated about the weight of the barrier which is left on top the suspension bridge. Is there any impact on the bridge stability. Although the traffic on the bridge is counted, but it is an moving traffic.
@rcraw6424
@rcraw6424 5 лет назад
no, nobody ever thought to calculate that, just you. You're a genius
@xl000
@xl000 5 лет назад
At 11:05 one guy lift a barrier with a 3:1 mechanical advantage. At 5:35, you're claiming each piece (pair) weighs about 1550 pounds, or 700 kg. That's 775 pounds / 350 kg per barrier.. I don't know... that looks like a lot to casually lift 120 kg (or 90 kg with a 4:1 mechanical advantage), given that he looks like an average built person. If someone can have a look at the physics behind that
@dazurez
@dazurez 8 лет назад
Brilliant, thank you.
@johnmcgovern3806
@johnmcgovern3806 5 лет назад
Why didnt they start in the middle and work out to each end. No need for an adjustable link
@redwarf8118
@redwarf8118 4 года назад
They would need two adjustable links for both ends.
@alekseiantonovich9272
@alekseiantonovich9272 4 года назад
@@redwarf8118 It is open at the ends: ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-CeX1Fl_1cVE.html . Besides, who would you fix it? Barrier is shifted one lane, so ends are moving.
@geomodelrailroader
@geomodelrailroader 9 лет назад
the barriers had to go in because drunk drivers and suicide drivers cross the median and hit on coming traffic this will put a stop to that.
@evanstonbalce9588
@evanstonbalce9588 4 года назад
That’s true
@gerry343
@gerry343 6 лет назад
$30 million? What's it made of, solid gold?
@jaypom1513
@jaypom1513 7 лет назад
That second to last piece is actualy telescopic. They would never have had to redo all of one side.
@lifesavrdwd
@lifesavrdwd 9 лет назад
Thanks for the video, it was surely well done and informative. I can't believe they don't have a jig that allows them to pickup and move one of the barriers from its side. Strange. I wonder about the added weight to the bridge. I must be a lot, though it is spread across the whole span.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
+lifesavrdwd Thanks for the comment I appreciate it! There are a couple of us who have speculated about the weight elsewhere in the comments for this video.
@joek0617
@joek0617 9 лет назад
+lifesavrdwd nah. the maximum each set of 2 could possibly weigh is only 3200lbs, based on the jig's warning marker.
@3martiniplaydate
@3martiniplaydate 9 лет назад
Are you f.ing kidding me? I hated driving on the GG. I was already creeped out enough by just driving on the bridge but then worrying about oncoming traffic was a nightmare. I still hate driving on the Bay Bridge though. I hadn.t been driving long when we were hit by Loma Prieta and I know that my fear of driving on either bridges is related to that. If I have to go to the East bay, I take bart. I rarely,if ever, drive on the Golden Gate but if an occasion calls for the North bay, I make someone else drive while I freak out in the back seat.
@Maloy7800
@Maloy7800 9 лет назад
And after they're done, they watch the drone video, drink beer and say, "YEAH, we held traffic on the busiest city artery for a whole day. The day went well!". And laugh.
@Gamerz00760
@Gamerz00760 6 лет назад
I am wondering when tow motors semi trucks and cranes wil get cameras to view in front and behind. It would be much easier if operators werent blind the entire time and going by voice guidance or trying to guess.
@TanukiOfficial
@TanukiOfficial 6 лет назад
Great video! 👍 Really enjoyed your humorous narration. You have a very, very nice voice.
@Matt68B
@Matt68B 6 лет назад
Awesome, I've never seen such a barrier before!
@PatrickWagz
@PatrickWagz 7 лет назад
Thanks for sharing, this was fascinating. It looked like quite a few of the sections were adjustable length-wise. That poor guy needs a bigger hammer.
@jonathancook4022
@jonathancook4022 7 лет назад
They need a bigger hammer!
@PatrickWagz
@PatrickWagz 7 лет назад
I thought the same thing!!
@geomodelrailroader
@geomodelrailroader 9 лет назад
once the barrier is installed it will be ran over with a zipper truck to move it into its final spot.
@tedlovestrand6384
@tedlovestrand6384 9 лет назад
San Francisco and surrounding areas have the most stringent EPA laws but yet they are running mid 90's trucks on this project. I also have to add that these lift truck drivers are horrible.
@MegaFakedude
@MegaFakedude 8 лет назад
+ted lovestrand The barrier machines are using tier III diesels. They should have been using the newer, much cleaner tier IV
@Paul02111960
@Paul02111960 9 лет назад
Excellent video beautifly shot (we are so spoilt these days with HD) but this does look great.....Thanks.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Paul Phelps Thanks, glad you enjoyed it.
@JustWasted3HoursHere
@JustWasted3HoursHere 8 лет назад
SCIENCE! YEAH! Damn, is there any problem we can't solve? Humans are awesome! JW3HH
@peggyt1243
@peggyt1243 8 лет назад
+JustWasted3HoursHere Yes the people of New Zealand came up with the moveable barrier and road zipper and did so 25 years ago (1990).
@BobSmith-mc7uq
@BobSmith-mc7uq 6 лет назад
Good video & narration. Of course the "moms basement keyboard warriors" have had their say, as meaningless drivel.
@MrOly0001
@MrOly0001 9 лет назад
im soory it was closed for road bed replacement in the 80's
@tsialongthow9449
@tsialongthow9449 9 лет назад
THIS THING TAKE FOREVER TO GET THRU- THE BRIDGE. PERSON LIKE ME THAT HAD NO DEGREE MAY HAVE A BETTER IDEAL THAN THAT. TOO SLOW. YOU DON'T USE FOLK LIFT TO LINE UP. USE MACHINE FROM THE GROUND WERE YOU LINE THE BARRIER AND PIN IT AT THE SAME TIME AND PUT THAT MAN THAT STANDING AROUND THERE TO DO SOMETHING ELSE.
@MegaFakedude
@MegaFakedude 8 лет назад
+Tsialong Thow This way may not be the best, but it is the cheapest. Also, if unions are involved, this is how it HAS to be done. Unions hate efficiency.
@redwhitentrue
@redwhitentrue 7 лет назад
Why didn't they just start in the middle and work outward? Oh, yeah... unions.
@brianakl
@brianakl 7 лет назад
lol the Auckland harbour bridge got this back in 2010
@markgelk
@markgelk 9 лет назад
could have avoided all that crap in the middle
@jeremoe1
@jeremoe1 9 лет назад
That was nice of you to record a piece of history. I'll be traveling across it sometime this spring when I make my adventurous run out west, a trip I'm looking forward to. I enjoyed watching the video.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Najja Foluke Thanks. You can now cross more safely!
@jeremoe1
@jeremoe1 9 лет назад
Party Of The Third Part Right on time!
@David-mi1tz
@David-mi1tz 9 лет назад
Great viewing. Thank You.
@CharlesTheClumsy
@CharlesTheClumsy 7 лет назад
Awesome narrating all of this.
@jsaylortx
@jsaylortx 9 лет назад
Scary? Has this man never driven on a two-lane highway? I know of some fairly narrow two-lane highways that have a speed limit of 75.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
Jordan Saylor It was a little scary because the lanes are narrower than standard, there are no shoulders at all, the markings of the lanes do not distinguish in any way the directions (there are only white dots that are the same in every lane), there are no lights above the lanes as many places have to show the direction of travel, and the lane configurations change at different times of the day. So other than the little widely-spaced plastic pylons, that are difficult to see, especially at night or when there is thick fog (which is very common on the bridge), there were no visual clues as to which lanes were for which direction, and the configuration is different at different times. What was most scary was relying on all other drivers, including people from out of town and "impaired" drivers, to handle this situation correctly. Also, those narrow roads you're talking about are typically one lane in each direction. On the bridge, there are 6 lanes. So when you're in that left lane, if someone in the 2 or 3 lanes to the right of you makes a mistake (because they're a tourist gawking at the bridge) or has a mechanical problem (such as a semi blowing a tire), and swerves into you, there's nowhere for you to go, you're going into the opposing traffic because it is only 12 inches away and there was no barrier. And the bridge is very busy, so you're not going to find an empty spot, you will have a head-on collision. This is why the leftmost lanes on the GG bridge were widely known in the Bay Area by the nickname the "suicide lanes".
@buddyclem7328
@buddyclem7328 5 лет назад
Where is there a 2-lane highway with a speed limit of 75MPH? In the United States, the highest, non-interstate highway speed limit is 70MPH, in Ohio, only for 4-lane divided highways.
@pezazul_4549
@pezazul_4549 4 года назад
Why so many stress? . They could not fail. There is one link adjustable.. Risky link by the way, it can be stuck while moving the barrier
@travelingwithrick
@travelingwithrick 5 лет назад
The promentary point of medians. Why do l like these videos?
@marksheffield7666
@marksheffield7666 9 лет назад
Start at the middle and work to each edge would save all that heave ho
@peter_smyth
@peter_smyth 8 лет назад
There would likely be "heave ho" linking the barrier up to the permanent barriers at both ends then.
@robertvalderaz7329
@robertvalderaz7329 6 лет назад
Get a bigger hammer and the dude won't have to beat so many times.
@dw75002
@dw75002 9 лет назад
In reference to the bridge never being closed for construction, there have been closures when they were re-stringing the vertical suspender cables. They had a machine that climbed up and down the main cables, and they had to close the bridge for a few hours when they moved the traveler from one section of the bridge to the next.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
dw75002 Various news reports at the time made this claim. The claim was that it had never been completely closed for construction, only for various celebrations. I can't vouch for the accuracy of those reports, as the bridge has been around longer than I have ;)
@gatekeeper368
@gatekeeper368 9 лет назад
Party Of The Third Part I was there when the traveler was moved from one side to the other during the restringing operation. Yes the bridge was completely closed in the middle of the night.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
gatekeeper ' Thanks for letting me know! I'd fix the video if I could, but RU-vid doesn't allow in-place replacement. I'll see if I can put something in the annotations (for those that can see annotations).
@zid-ziddy-zid6821
@zid-ziddy-zid6821 8 лет назад
Love the commentary
@MrCowboy1492
@MrCowboy1492 8 лет назад
Oh, after watching the vehicle that moves the barrier I see. they are NOT dragged, they are lifted up before moving.
@believeinyourself7511
@believeinyourself7511 7 лет назад
Thank you for the great narration and info.
@GlitchMonki
@GlitchMonki 8 лет назад
Why am I watching this?
@mattuk1310
@mattuk1310 8 лет назад
i'm questioning about them pieces are what he said 1,550 lbs each .... @ 8.10 min into this (3) men drag one over into place.. i don't believe that would be possible as each man can't move 500lbs like that
@PartyOfTheThirdPart
@PartyOfTheThirdPart 8 лет назад
+Mat Tuk Here is a newspaper article about the project, in which it is stated: "The barrier will be made of more than 800 blocks that weigh 1,500 pounds each. " www.mercurynews.com/california/ci_27273680/new-zipper-trucks-golden-gate-bridge-will-move
@peter_smyth
@peter_smyth 8 лет назад
The barriers are made of steel, and I think are filled with concrete after installation by the hose connected to that thing with wheels being slid across the top of the barrier.
@PartyOfTheThirdPart
@PartyOfTheThirdPart 8 лет назад
+Peter Smyth The barriers are already filled in with concrete when they are installed. The wheeled thing that goes across the top aligns the segments properly and then drives the connecting pin between segments in the rest of the way (the guy with the hammer only starts the pin going, hammering it only part way in). The segments are heavy, but have a relatively smooth bottom and three strong men can slide them a little bit at a time across the relatively smooth pavement. But it takes a lot of effort and they don't do that often.
@peter_smyth
@peter_smyth 8 лет назад
+Party Of The Third Part I was wondering what that does, and how the pins got fully inserted.
@MegaFakedude
@MegaFakedude 8 лет назад
+Mat Tuk The thing they are moving is a VLB (variable length barrier). This is hollow steel. They place these every so often to accommodate the expansion and contraction of the barrier as it changes positions. As you can imagine, the barrier changes length as it goes through the machine. Anyways, it's not 1500 lb, as you guessed. Maybe around 500 or so.
@glenncsr.88
@glenncsr.88 3 года назад
They need a couple more men on that job.
@Backyardwoodworks2014
@Backyardwoodworks2014 9 лет назад
any idea how many sections?
@PartyOfTheThirdPart
@PartyOfTheThirdPart 9 лет назад
BackyardWoodworks Crafts & More Good question! I read a news report that said there are 3,517 segments. Each segment is 1 meter long, but I don't know if that includes any gap between segments. The bridge is 2,737 meters long, so obviously they go beyond just the bridge itself and include some of the approaches on each end.
@KOOLDAVE1953
@KOOLDAVE1953 9 лет назад
I was going to ask about the total weight but Kingmike 40 already addressed that issue.
@YuiHellshire
@YuiHellshire 8 лет назад
when they drop the barrier, watch in the back ground the bridge does move a little.
@jimmorgan1455
@jimmorgan1455 6 лет назад
That voice sounds like Mike. Hope you don`t see your hairy friend on the bridge.
@1topfueldrag
@1topfueldrag 5 лет назад
while it’s closed it looks like that would be a good time to do some paving work. Nice vid
@gordonmillar998
@gordonmillar998 9 лет назад
Riviting! Great to see the bridge up close and personal. Tks
@Captain_Coleslaw
@Captain_Coleslaw 7 лет назад
The last piece from the north side is extendable, so it would always fit no matter what they did
@theyruinedyoutubeagain
@theyruinedyoutubeagain 7 лет назад
I'm an engineer and I didn't even consider that lol. Good catch
@paulzale7429
@paulzale7429 5 лет назад
Using 2 hands 2 swing a little hammer! Haha! Get a bigger Hammer!
@MookMajor
@MookMajor 7 лет назад
did you find the footages you should post that too
@ShipSpottingNederland
@ShipSpottingNederland 8 лет назад
Very interesting to watch and to listen, thank you for uploading! :-)
@martintorrez25
@martintorrez25 7 лет назад
It's always great to see CalTrans workers actually working. LOL
@BobSmith-mc7uq
@BobSmith-mc7uq 6 лет назад
You mean the fork lift driver & the hammer man? All the rest were supervisors & office junkies out to get on camera.
@tsialongthow9449
@tsialongthow9449 8 лет назад
Thank you for your response. I just don't want the outsiders to point a finger to us as a United States of America. We want to be the best and right for others to follow. Thanks
@peggyt1243
@peggyt1243 8 лет назад
+Tsialong Thow USA is following New Zealand and is 25 years late.
@billysmith5721
@billysmith5721 5 лет назад
i worked in the souvenir shop at the round house
@fimbles1015
@fimbles1015 7 лет назад
So now it even narrower?
@Bobcat665
@Bobcat665 7 лет назад
My city could use one of those!
@DesertDigger1
@DesertDigger1 7 лет назад
Hey Caltrans, Moonbeam and the union will steal your pension.
@kingmike40
@kingmike40 9 лет назад
At 13340 ft long and each piece being 3.28 ft and weighing 1550lbs that comes to 6,303,963 lbs that is on the bridge all of the time. I wonder if they took in to account the wear and tear of the bridge, but if guess there really wasn't another option.
@mnmomen9618
@mnmomen9618 9 лет назад
+kingmike40 -- ITS GOOD JOB YOURS AS ALREADY YOU MAKE MATHS BEFORE I DO IT, THANKS BUDDY, SO IT COMES 2,865 M.TONS WOWWW, WHAT A BIG DEAL OF WEIGHING CAPACITY OF THE GG BRIDGE.
@MegaFakedude
@MegaFakedude 8 лет назад
+kingmike40 The company that built this system, Barrier Systems, was purchased by Lindsay. Barrier Systems was formed roughly 20-25 years ago for the primary purpose of putting this system on this bridge. It's taken that long to get all the approvals and funding. In that time, though, dozens and dozens of these systems have been deployed throughout the world. You can be sure that the bridge engineers had hundreds of hours of discussions of the extra weight. Take into account, though that cars are getting much lighter. We have priuses and Leafs now, not Oldsmobiles and Buicks.
@sonpit
@sonpit 5 лет назад
How often do they have to move it?
@madkirk7431
@madkirk7431 5 лет назад
Twice a day using a "zipper" vehicle
@jettero75
@jettero75 9 лет назад
Massive little modules.
@Nicholas-f5
@Nicholas-f5 7 лет назад
The master link looks to be adjustable, even up to part of the full meter :)
@playtoyjoy8256
@playtoyjoy8256 Год назад
빨리 강변북로를 넘어 미사 잠실간 올림픽대로에도 BTX BUS차선이 생겼으면 좋겠다
@kjjosker
@kjjosker 3 года назад
they could always just put up red and green lane lights like the rest of the world.
@tomsawyerrush938
@tomsawyerrush938 9 лет назад
good jobs
@croyfer
@croyfer 9 лет назад
Awesome!
@MrSuzukiyamaha
@MrSuzukiyamaha 8 лет назад
Great video
@PartyOfTheThirdPart
@PartyOfTheThirdPart 8 лет назад
Thanks
@dogapart4701
@dogapart4701 7 лет назад
Thanks for the video mate.😊
@giovannifiorentino8947
@giovannifiorentino8947 3 года назад
Great investigation job. What is the annual operation cost?
@PhearaXT
@PhearaXT 3 года назад
About $23 million dollars
@buddyclem7328
@buddyclem7328 5 лет назад
8:27 was that Mythbuster Jamie Hyneman?
@vicenteaguilar9562
@vicenteaguilar9562 7 лет назад
Muy bueno
@isupportyou9929
@isupportyou9929 8 лет назад
too many cars bring too many problems
@vincentdeguard4726
@vincentdeguard4726 7 лет назад
too many people bring too many problems
@neanam
@neanam 6 лет назад
Vincent de Guard too many bosses too many loses
@divefree1044
@divefree1044 8 лет назад
No wonder the state is so poor, too many people standing around supervising with their hands in pockets!
@thepeon5523
@thepeon5523 7 лет назад
it ended when you said goodbye
@dondreytaylor8001
@dondreytaylor8001 8 лет назад
$30 Million for a barrier? My goodness, that doesn't seem a bit high? LOL
@chorknator
@chorknator 8 лет назад
+Dondrey Taylor I think this is for the whole system including the "road zipper" - This machine thal allows to shift these blocks by one lane to the left or right.
@dondreytaylor8001
@dondreytaylor8001 8 лет назад
Ah true. I didn't think about the cost of the road zipper being included + construction costs + planning costs. They could probably even estimate lost tolls due to closures. I guess $30 million would make sense.
@peter_smyth
@peter_smyth 8 лет назад
+Dondrey Taylor I think each zipper truck costs $1.4 million.
@idadho
@idadho 8 лет назад
+Dondrey Taylor $30 million sounds reasonable, considering..... The new east span of the bay bridge originally was projected to cost $800 million, then just over $1 billion. It ended up costing $6.4 billion. And, it is cracking and at risk of failing. Projects like this cost fortunes to please unions and political supporters. They just throw the bill at taxpayers who have no choice but to pay high tolls. Only San Francisco and Oakland politicians can spend other peoples money like is flows in with the tide. Los Angeles has their subway. Another taxpayer funded boondoggle. Minimal tolls lost and minimal construction costs. Just the Road Zipper machines and the blocks at about $5000 per foot.
@dondreytaylor8001
@dondreytaylor8001 8 лет назад
Mark G Wow, thanks for the break down. I had no idea they spent this much on these types of projects.
@theman37251
@theman37251 2 года назад
Somebody will freak out and feel Closter phobic and I guarantee you they will cause an accident
@thepeon5523
@thepeon5523 7 лет назад
it's the end of the world and
@nokithecat
@nokithecat 7 лет назад
The very smallest car on the road doing warp speed will crash into the barrier and knock all the pieces into the river (O.o)
@timothyptittle
@timothyptittle 5 лет назад
Kitty Cat No...No they won’t! These are Designed and Rated as Non-Gated QMB Barriers. Which means, Non-Gated= No Pass Thru. A fully loaded semi truck going 50-55 MPH hitting the pinned *Quick *Moveable *Barriers at a ~30-50 degree angle WILL NOT (should not) Break or Go Through/Over the Wall and into oncoming traffic. They have been Crash Tested and Rated.
Далее
The Golden Gate: Building an Impossible Bridge
9:43
Просмотров 3,9 млн
Ответы Мэил Ру
01:00
Просмотров 1,5 млн
Почему?
00:22
Просмотров 344 тыс.
The Golden Gate Bridge Is Starting To Show Its Age
4:28
San Francisco - What NOT to Do in San Francisco
18:09
Просмотров 249 тыс.
3m reclaim tunnel demonstration
10:43
Просмотров 11 млн
GW Bridge Painter: Dangerous Jobs
3:48
Просмотров 8 млн
How zipper machines help traffic flow in Dallas
2:09
Did You Know #9 - Facts about The Golden Gate Bridge
13:23