Тёмный

Hinkley Point C | Dome Lift 

EDF 🇬🇧
Подписаться 21 тыс.
Просмотров 52 тыс.
50% 1

Опубликовано:

 

21 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 21   
@hypercomms2001
@hypercomms2001 10 месяцев назад
As an engineer myself, congratulation to the team! Well done!
@owensmith7530
@owensmith7530 10 месяцев назад
That's one hell of a crane!
@swokatsamsiyu3590
@swokatsamsiyu3590 10 месяцев назад
I'll say! Engineering like this never gets old for me.
@karlknicks4700
@karlknicks4700 6 месяцев назад
Must be a Broderson crane.
@bertrandc8207
@bertrandc8207 10 месяцев назад
Belle réalisation technique. Congrats !!
@MUSTASCH1O
@MUSTASCH1O 10 месяцев назад
Wish I could go back and see how everything has changed. Well done!
@Nagilum3
@Nagilum3 9 месяцев назад
I wonder how much CO² was emitted to build it, once it's done.
@marcohinze9032
@marcohinze9032 8 месяцев назад
I live in Germany and work for Framatome a part of EDF. We produce different parts for HPC and deliver them direct on site.! That's so cool..
@empyrekingslayer3657
@empyrekingslayer3657 10 месяцев назад
Incroyable performance 👍
@manjum7172
@manjum7172 2 месяца назад
Congratulations Team!!
@charptho
@charptho 10 месяцев назад
Thats crazy civil engineering right here.
@adamarmfield1069
@adamarmfield1069 9 месяцев назад
helping britain achieve net zero but using loads of concrete, yes I know it's purple concrete or whatever, but a huge driver of global heating, 5% of all emissions or something, also not convinced this will be easy to maintain and look after once oil runs out, in, what 50 years max? what are the plans for keeping the site safe 1000 years from now? the land was sold to you for a wind farm.
@m.e.345
@m.e.345 5 месяцев назад
that will definitely come in handy if it rains. 😄
@mariopavan4457
@mariopavan4457 10 месяцев назад
In me Mexcico at the Moment. It looks veri food and Inter interesting. Well done
@io9883
@io9883 5 месяцев назад
Il faudra introduire davantage de robots automatisés et de véhicules sans pilote pour accélérer le processus de construction. Si l’efficacité n’est pas entièrement améliorée, l’énorme croissance des commandes futures sera manquée et reprise par d’autres fabricants.
@Chiavaccio
@Chiavaccio 8 месяцев назад
👏👏👏👏👏👏👏
@michaele8442
@michaele8442 9 месяцев назад
British society will pay the follow-up costs when the term comes to an end. That's clear, dear children and the unborn. You will pay for it all. Meanwhile, your parents have been partying.
@Nagilum3
@Nagilum3 9 месяцев назад
They already have to downpay 46 bn Pound + operational costs.
@Krasbin
@Krasbin 2 месяца назад
And then you wonder: Why is it so expensive? and Why is Britain going bankrupt?
Далее
Angry bird PIZZA?
00:20
Просмотров 7 млн
I Used The WORLD'S LARGEST CRANE! (5000 TON CAPACITY)
14:51
Here's what it looks like inside a nuclear power plant
4:16
Explore The MEGA Crane Ship That's Changing The Game!
12:42
Understanding Porsche's New Six Stroke Engine Patent
21:57
Hinkley Point C in 2023
3:46
Просмотров 520 тыс.
Building Sizewell B
34:19
Просмотров 21 тыс.