I’m curious as to When someone would choose to do this over pouring a concrete slab at ground level ? For a first floor far easier than making a form that would hold concrete... but at ground level???
It’s a requirement for heavy clay soils. There needs to be a separation between the ground and the subfloor (in my case 225mm). I’ve also got a tree nearby, which affects the moisture content of the clay soil. Clay soils can heave and crack your concrete slab. … so they say.