How is DPC laid?
The damp-proof course should be laid at plinth level i.e. at floor level in all building except temporary structures. ... On the outer walls the DPC is laid at the ground level, to save wall from dampness of floor, vertical DPC is laid on the outer walls on internal surface from ground to plinth level.
10 май 2021