Installing Off Grid Solar - Mounting the Schneider MPPT 80 600 Solar PV Charge Controller 

5th Journey Off-Grid Homestead
Подписаться 6 тыс.
Просмотров 6 тыс.
50% 1

Today I'm mounting the MPPT 80 600 Solar PV Charge Controllers. These are a lot lighter than the XW Pro Inverters by far. I did forget to remove the knockouts for the wires that will run through them but was able to get them out while the units were already mounted.
I also started work on the Power Distribution Panel and should have the wire diagram I'm needing to get started wiring everything up in the next video.
Schneider Electric Solar
solar.schneider-electric.com/
XW PDP Solar Power Distribution Panels
(XW Conduit Box - 865-1025-01)
(XW Power Distribution Panel - 865-1015-01)
solar.schneider-electric.com/...
Conext MPPT 80 600 Solar PV Charge Controller
solar.schneider-electric.com/...
XW Pro Solar Hybrid Inverter 120/240V
solar.schneider-electric.com/...
Northern Arizona Wind & Sun
www.solar-electric.com/
MidNite Solar MNPV3 Solar Array Combiner
www.solar-electric.com/mnpv3....
Square D 600 Volt 60 amp DC Array Disconnect 3-Pole
www.solar-electric.com/square...
Thanks for watching our video:
Installing Off Grid Solar - Mounting the Schneider MPPT 80 600 Solar PV Charge Controller
10% Off Everything on Fiverr with the following Link.
www.fiverr.com/s2/68126fced7
Fiverr empowers entrepreneurs to connect with pros who can help them do more with less. Graphics Design, Marketing, Writing/Translating, Video, Music, Programming, and more.
Background:
We are an Off Grid Family building a unique home in rural Kansas. Some would call it an Barndominium. Off Grid Living isn't for everyone but we plan to triumph through the ups and downs. Our electricity comes from our Off Grid Solar System and our Rain Water Harvesting set up provides all we need to as this couple builds a home. Once the build is done we will focus more on being an Off Grid Homestead. So please follow us as this couple builds a house and home off the grid.
#diy
#offgrid
#solarpower
#photovoltaic
#homesteaders

Опубликовано:

 

18 июн 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 14   
@estellaknox4488
@estellaknox4488 3 года назад
Everything coming together awesome
@Off-Grid
@Off-Grid 3 года назад
This has been a fun project to do. Like one big puzzle with no corners.
@garylcampbell9964
@garylcampbell9964 3 года назад
DIY people save a lot of money.
@Off-Grid
@Off-Grid 3 года назад
Oh yes, we've been adding it up and the amount we've saved is astounding.
@dobrzpe
@dobrzpe 2 года назад
yea, you are SO right! i just got a quote to replace my old Xantrex XW 6048 with the Schneider XW Pro 6848 and he wanted $1500 just in labor to hook up, what - 4 wires and 2 RJ45 connectors?!? no way. it's NOT like it's a new install or anything. not to mention the $700 extra he wanted to charge for the inverter over what AZ Wind & Solar is selling it for.
@jeffbarger3465
@jeffbarger3465 3 года назад
how many kW's did you decide to go with? With your 2 season panel array set up, it will be interesting to to see the differential between summer and winter.
@Off-Grid
@Off-Grid 3 года назад
It is 15.36kw. Bit of a big system but still less than half the cost of hooking up to the grid and we didn't want to compromise to much on power.
@reneroman1421
@reneroman1421 2 года назад
Hi...I have 2 mppt Schneider with a 6848 pro, both with 9 PV 330W ...they are configured primary and slave, but I have noticed that they do not both produce the same...the primary is always lower in production that the slave....do you know what my problem is?...thanks
@Off-Grid
@Off-Grid 2 года назад
Yes, you need to calibrate the inverters to each other. It is a $500+ tool that you'll use for ten minutes. There are specific instructions to follow. I had to get them directly from Schneider tech support, which isn't very good. I eventually disconnected one inverter and am only using one now since we've never exceeded output of a single one and the dual set-up was very buggy. I'm keeping the second as a spare.
@richardnassab1869
@richardnassab1869 2 года назад
Hey good day. Can you tell me the how the inverter is doing so far. And are you satisfied with it? I have one the sw6848 + Still do not hook it up as yet need a charge controller.
@Off-Grid
@Off-Grid 2 года назад
Everything is working fine since I disconnected the slave inverter. The dual set-up was very buggy and I realized that we've never exceeded the output of a single inverter. Keeping the second one as a spare.
@joek6791
@joek6791 9 месяцев назад
Piece of junk no customer support
@Sanwizard1
@Sanwizard1 2 года назад
How much so far?
@Off-Grid
@Off-Grid 2 года назад
How much did I pay? Total is just under $30k
Далее
Wiring the transformer based Schneider XW PRO and PDP
28:41
Schneider Electric 3 Phase with XW Pro
41:37
Просмотров 3,7 тыс.
Going Solar? Watch this torture test!
22:54
Просмотров 32 тыс.
Wiring a Schneider XW Pro
10:24
Просмотров 11 тыс.
Easy Parallel Stacking for Massive Peak Power
12:11
Просмотров 84 тыс.