Тёмный

New Lock at the Soo project update 

Usace Detroit
Подписаться 1,6 тыс.
Просмотров 4,4 тыс.
50% 1

Опубликовано:

 

21 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 6   
@kentslocum
@kentslocum Год назад
The concept of hand-free mooring was new to me, but it makes sense to simply pinch the ships between the sides of the lock rather than tie them off. My only real concern is that the mechanical devices used for the hands-free mooring are a new point of failure for the lock. The old Poe lock has managed to last past its design life because it's dead simple. I'm definitely worried that introducing complications can cause the new lock to need to close more often for maintenance.
@lynnstrong3055
@lynnstrong3055 3 года назад
My dad worked for great lakes dredge and dock back then dredging for the poe lock . We lived on riverside drive right next door 1958 to 1961 he was there getting ready in 57
@cliffwoodbury5319
@cliffwoodbury5319 2 года назад
how come they don't have a lock at the base of the UP close to Marquet and Au Train and Rapid River. It would make the trip to and from Chicago a lot quicker to Lake Superior!
@kometfan1977
@kometfan1977 Год назад
There is no major river or waterway between those locations is probably the main reason why.
@coldspring624
@coldspring624 Год назад
Thank god for Trump
@kometfan1977
@kometfan1977 Год назад
For? What does this have to do with him?
Далее
New Lock at the Soo: Highlights of a Busy Year
39:14
Просмотров 3,7 тыс.
New Lock at the Soo: Key to the Great Lakes
51:49
Просмотров 3,1 тыс.
Behind The Scenes:  New Soo Lock Construction
5:50
Просмотров 11 тыс.
Valley Camp Museum Ship: Great lakers of ore
24:26
Просмотров 4,5 тыс.
Behind the Scenes at the Soo Locks
47:49
Просмотров 9 тыс.
The Soo Locks - Locking Through in a Small Boat
11:55
Younger Dryas Ground Zero
16:04
Просмотров 262 тыс.
New Lock at the Soo Construction Sequencing video
4:24