Hello. Please need expert's suggestions/advice. We hired a contractor for a mezzanine floor for our shop and our contractor by mistake/intentionally fixed 50mm PU sandwich panel on floor and finished concrete over it. We have mixed opinion about using sandwich panel as a floor. Our shop is going to open soon and our contractor is still very sure about it because he said sandwich panel has very good load bearing capacity. We are very confused and we do not have a time for re-work. Can anybody suggest me what to do in that case. Thank you
@@davidstewart8081Here’s what’s crazy, Lego IS developing “SIBS Building System”-Structural Insulated Blocks made with micro spun polymers for the “airy” skeleton that is a thousand times stronger than steel and then filled with micronized hemp foam to create the lightest/strongest building system ever created. It’s currently in testing.
We've been using these up in Pennsylvania for awnings and patio covers since early 90s and I've seen them hold up to above 18 in of wet snow and they easily hold the weight of 3 people.