Тёмный

Push Cat Pro. 

mog5858
Подписаться 2,2 тыс.
Просмотров 382
50% 1

Опубликовано:

 

25 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 7   
@lewiemcneely9143
@lewiemcneely9143 7 лет назад
THAT was quick but it shows what you were doing, loafing all over the place. I've pushed with 6-C's, 7-F's and 8-H's. The old 8 was a bugger. Pony motor and a 'U' blade plus a ripper. Building dams with 2- 631's, 2- 222 Wabco paddle pans and a TS-14 Euc double barrel. Pushed in 2nd notch and the pans cut between 4 and 6 inches. We moved some dirt and had a blast doing it. I likied your deal but it was too short. I'll just have to watch it again. Mr Squatch will be along presently, I'd say!
@mog5858
@mog5858 7 лет назад
short yes but you should be loading a scarper in about 30 seconds to stay in production.
@lewiemcneely9143
@lewiemcneely9143 7 лет назад
I don't know how long it took to load a 31 but it wasn't long in 2nd gear cutting a light cut. We kept moving pretty well.
@bcbloc02
@bcbloc02 7 лет назад
Needs more ponies under the hood!
@mog5858
@mog5858 7 лет назад
yes and no he was using all she had to give but more was not needed. they did have 2 D9 pushing you'll have to wait for that. max power can be down in the 250-300 rpm.
@lewiemcneely9143
@lewiemcneely9143 7 лет назад
You can go to Boston Power Cat and see a CHERRY double-9G. PLus a lot of neat other stuff.
@mog5858
@mog5858 7 лет назад
there was a quad d9 at the show as well push loading the 660 but i did not get any video of that
Далее