Rail seating handrails are now being installed in the south stand at Everton Stadium.
The Club’s new home will feature rail seating throughout the entire lower tier of the steeply-raked stand for home fans, and also in the lower section of the away end in the north east corner.
And as the seat installations continue, the first of the handrails are now in place.
The highly visual aspect of the barrel cladding is also progressing well, with work now underway on all four edges of the stadium roof.
In total, 872 individual panels polished aluminium panels - each one perforated to mitigate the effects of wind - will form the curved edges of the roof along the entire lengths of the east and west stands.
Meanwhile, work has begun on digging out the channel on the western wharf, which will eventually lead to the waterway being reinstalled.
Around 15,000 cubic metres of earthworks need to be excavated to create the new water channel that will connect neighbouring docks, provide a scenic overview from the Western Terrace and help provide a natural habitat for wildlife.
Subscribe to Everton Football Club's official RU-vid Channel: bit.ly/2wtCEbB
Follow us on Facebook: / everton
Follow us on Twitter: / everton
Follow us on Instagram: / everton
Welcome to the Official Everton Football Club RU-vid channel. We'll offer fans real insight into life at Goodison Park, Finch Farm and on the road with the Blues.
27 сен 2024