Тёмный

SCE Prospect Ave powerline maintenance 

Robert “Bob” Atkins
Подписаться 504
Просмотров 14 тыс.
50% 1

SCE rebuilding the power poles and replacing the power lines on Prospect Ave between Aviation and 16th Street.

Опубликовано:

 

2 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 21   
@RC-Heli835
@RC-Heli835 20 дней назад
Bucket work is so fascinating. Is this in Florida? I see a lot of palm trees!
@jolyonwelsh9834
@jolyonwelsh9834 3 месяца назад
4KV that's pretty low by today's standards. Nowadays they use 7.2KV to ground, 12,470 volts phase to phase.
@kgeitzel3293
@kgeitzel3293 3 месяца назад
Is that each phase or total?
@mxslick50
@mxslick50 2 месяца назад
@@kgeitzel3293 Phase to phase, 3 phase delta (no primary neutral). SCE has a hard-on for delta primary in a large portion of their service territory.
@chrislopez349
@chrislopez349 5 лет назад
This actually looks like a 4kv cut over not sure what the primary voltage is they’re cutting over to.
@linehandibew6205
@linehandibew6205 3 года назад
The new pot they were hanging on that pole was a 4kv can. Looks like they’re keeping same voltage but just upgraded wire pots and arms. Wish they would let us take a mass outage like that in New York lol. We pull wire in hot parallel everything in and remove everything with line hot.
@Bananahammock88
@Bananahammock88 3 года назад
@@linehandibew6205 yeah California is usually the same.
@chasefrank8143
@chasefrank8143 9 месяцев назад
A lot of your old 4kv was stuff put up back in the early 40s late 30s. Even for a cut over in Baltimore you got a 90% chance your taking a decent outage. Probably why they got guys on hooks. Need every swinging dick in the yard to get it done in the time frame.
@Henry-vq6tl
@Henry-vq6tl 3 года назад
They look like a contracting firm hired by your local power company
@jolyonwelsh9834
@jolyonwelsh9834 3 месяца назад
Are they in the union?
@Henry-vq6tl
@Henry-vq6tl 3 месяца назад
@@jolyonwelsh9834 🤷🏽‍♂️
@chacehart7286
@chacehart7286 3 месяца назад
@@jolyonwelsh9834100% Herman Weisseker is a IBEW 47 signatory contractor for Edison.
@jimlandreth555
@jimlandreth555 3 месяца назад
Never seen crossarms hung that way , bucket/lift makes things easier.
@michaelmorgan7893
@michaelmorgan7893 2 года назад
With those plastic insulators that are lightweight when compared to the old porcelain/glassware, they make easy work of lifting those new crossarms into place.
@benbensch3461
@benbensch3461 3 месяца назад
Do you keep the power on when do that
@sircampbell1249
@sircampbell1249 3 месяца назад
Cheap wooden poles
@mxslick50
@mxslick50 2 месяца назад
Wood poles have become almost, if not more, expensive than steel or concrete. (Due to the pressure treating and strength required.) And, in earthquake prone areas, wood poles won't crack or bend like concrete and steel can.
@sircampbell1249
@sircampbell1249 2 месяца назад
@mxslick50 only uses steel here
Далее
Being a Lineman - Episode 23
26:36
Просмотров 485 тыс.
МАЛОЙ ГАИШНИК
00:35
Просмотров 402 тыс.
БАГ ЕЩЕ РАБОТАЕТ?
00:26
Просмотров 107 тыс.
The REAL Problem with Smart Meters
20:05
Просмотров 542 тыс.
PG&E Power Pole Replacement
32:17
Просмотров 33 тыс.
GoPro and LineWork Edison, Redlands, District 31
4:21
IBEW Local 47 San Gabriel Mountains Helicopter Job
4:42
LPEA Pole Replacement Stage One
4:12
Просмотров 2,3 тыс.