Ek het verlede jaar oppad Richtersveld toe 'n vol gelaaide trein buite VanRhynsdorp oppad Saldahna gesien....wat 'n belewenis...dit het 'n volle 7 minute geneem om verby te kom... lekker om daai GE's te hoor werk met 'n swaar trein... Dankie vir 'n puik video....,👍
@@Imsaptouw the last time I visited the depot the class 33 and 34 diesels were doing the shunting work to the harbour. Still remember the flatbed wagon they used for extra braking power
Awesome footage,brilliantly filmed and compiled. Loved the shunting and the one train crossing over the other. It must have been tiring, keeping your hands up filming those long trains
Excellent compilation!!! BIG Like!!! Love this. I am excited that you've managed to capture TAL2003 in the yard. There is a recent mention on the web that the Sishen-Saldanha line had a shutdown due to severe strong winds that got a locomotive's panto entangled in the overhead line. (I have been thinking some time myself about doing a re-visit to the area - it is some time since I last have been there.)
Big Thanks Uncle!! I must admit it was stressful going up to Saldanha and Velddriff back and fourth because the trains are just sooo long. Im just glad i could get some footage and tick it off my bucket list. I havent seen any small GEs in the yard? Maybe they're on the other side where there is no access road.
@@Imsaptouw In my experience when the Saldanha Smelter was still in operation, Class 35's would bring trains from Bellville as far as LANGEENHEID. The locomotives sometimes spent some time stabled at Langeenheid before taking the next train to Bellville. SALKOR yard would fetch the trains left at Langeenheid with their own motive power which could be class 35's as well, and I assume the TAL2003 might now be deployed to do this work. The problem is that class 35 is on its last legs (wheels) with most locomotives in very poor mechanical condition - you can hear that by listening to the Malmesbury train on most days. Often trains appear to be on the very brink of failing.
@@RAILFANinSOUTHAFRICA thats true, when i went out to the station today, to see the Malmesbury, the diesels dont sound the same anymore, parts are an issue. When i visited Bellville yard/workshops, there were alot of 35s/parts around the grounds. They do what they can but its still not enough, the numbers are dwindling by the day, if its not fires its derailments or mechanical failures.
I ve seen almost all rail infrastructure in SA… different types of overhead wire infrastructure but this one of orex looks unique and I m yet to see the line live, let alone the monster electric locos unique to this line