Тёмный

Slough - Windsor & Eton Central 

mark townend
Подписаться 40
Просмотров 100
50% 1

An idea for running the GWR Slough - Windsor branch line at 15 minute service interval using two battery-powered trains as follows:
Automation - highly suitable due to full segregation of the line with no level crossings.
A double-sided platform layout at Windsor, with segregated boarding and alighting so reversing is achieved as quickly as possible. Doors sequenced to allow people off one side before boarding from the other.
Second platform track added at Slough and use two trains, allowing one to be waiting and charging its batteries at all times, departing as soon as the other arrives.
A member of staff can be posted at each of the stations to supervise ticket gates, observe boarding and press the go button for the automation system to drive to the other end of the line.

Опубликовано:

 

13 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 1   
@royarmentano1957
@royarmentano1957 6 месяцев назад
the slough station have 6 platfor in 3 yaers ago i think heje
Далее
iPhone 16 для НИЩЕБРОДОВ!
00:51
Просмотров 2,1 млн
bedford9 blk   Block 2023 05 25 11 49 12
4:32
Terrible sniper AI
1:09
Просмотров 39
Why London Is Insanely Well Designed
9:01
Просмотров 1,7 млн
Smart Meter Disaster!!
16:33
Просмотров 363 тыс.
Secrets of The Motorway - M60 Part 2
8:37
Просмотров 119 тыс.
The Art Deco Railway: The Chessington Branch
8:20
Просмотров 85 тыс.