The Essential tests - Continuity of the CPC 

JPElectric
Подписаться 7 тыс.
Просмотров 5 тыс.
50% 1

This is the first in a series of videos explaining the test procedure for the initial inspection and testing of an electrical installation.

Опубликовано:

 

5 авг 2019

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 17   
@user-cc2ov2tt8u
@user-cc2ov2tt8u Год назад
great help with my revision a lot more concise than my college videos/tutors
@JPElectric
@JPElectric Год назад
Thanks Kyle, good luck with your studies.
@AngelaPeters-fy1tc
@AngelaPeters-fy1tc Год назад
Thanks so much and like the fact you checked your r1 +r2 readings from the table in OSG just to double check.
@JPElectric
@JPElectric Год назад
Thanks Angela appreciate your comment
@cyberlightbeing
@cyberlightbeing 2 года назад
Brilliantly explained, many thanks.
@JPElectric
@JPElectric 2 года назад
Thanks cyberlightbeing. appreciate it.
@Order115
@Order115 11 месяцев назад
Simple and to the point, thank you!!
@JPElectric
@JPElectric 11 месяцев назад
Thanks for watching
@SteveHewittMusic
@SteveHewittMusic 2 года назад
Thank you so so much for this, I love the way you explain it very simply and make it very understandable. Thanks so much it’s help no end. Godbless
@JPElectric
@JPElectric 2 года назад
Thanks Steve. Really appreciate your comments
@mounikaponnusamy3814
@mounikaponnusamy3814 2 года назад
Hi sir, You have provided very useful information and the way of explaining is amazing. Thank you so much. I have a doubt on this topic. I read about this in a book and they mentioned as below. Can you explain about this👇👇 "The test should be made by connecting together the neutral and protective conductors at the mains position and checking between earth and neutral at every outlet by a continuity tester, which should show a reading near zero."
@JPElectric
@JPElectric 2 года назад
HI Mounika, Thanks for the comment. The usual test is connecting the Line and Protective conductors together (Isolated of course) This is your R1+R2. R1 is the Line (Live) and R2 is the CPC. The reading will depend on the length of this loop. All cable has some resistance, But you would expect a very low Ohms reading. So if you have 20 meters of 2.5mm2 twin and earth cable The expected R1+R2 would be around 0.39 ohms.
@danielteyehuago1633
@danielteyehuago1633 8 месяцев назад
Please which book and a page that we can find the information on cable size with it ohmic value per a meter.
@danielteyehuago1633
@danielteyehuago1633 8 месяцев назад
Please what instrument will be required for the testing here
@1001polly
@1001polly Год назад
Hi nice vid but a quick question, how did we know the length of circuit is 30m. Thanks
@danielteyehuago1633
@danielteyehuago1633 8 месяцев назад
Please how can i get the on-site guide and. Which version is current
@_mackenziie
@_mackenziie 8 месяцев назад
😂
Далее
Testing an Extraneous Conductive Part (High or Low)
10:18
Continuity of CPC on a radial circuit - R1+R2 & R2
13:42
Continuity of protective conductor
13:04
Просмотров 11 тыс.
Ring continuity | Step One, two and three. (49)
14:06