Тёмный

The Mumbai Underground Metro | Project Nears Completion, Phase 1 Seepz-BKC May Be Ready By Dec 2023 

moneycontrol
Подписаться 1,3 млн
Просмотров 386 тыс.
50% 1

The Mumbai Underground Metro: Mumbai Metro-3, the first fully underground metro of Mumbai, is built at Rs 33,000 cr nears completion.
Spanning 33.5 km, the metro has 26 stations with a depot.
Since its construction in 2016, the metro has faced controversies and challenges. Right from the protest against allocating Aarey land to constructing tunnels below the heritage buildings in South Mumbai.
Phase 1 from SEEPZ to BKC will likely start from December 2023, whereas Phase 2 from BKC to Cuffe Parade will be ready by July 2024.
Once fully operational, it will carry 17 lakh passengers per day.
Check the video to know how the Mumbai Metro-3 will become the second lifeline of Mumbai.
#mumbai #mumbaimetro #mumbainews
Moneycontrol is India's leading financial and business portal with in-depth market coverage, analysis, expert opinions, and a gamut of financial tools.
A part of Network18, moneycontrol.com is the most influential destination for stock market news and advice, business news, and news about the Indian and global economy.
Subscribe: bit.ly/moneycontrolyoutube
Follow us:
Visit www.moneycontrol.com/
Facebook: / moneycontrol
Twitter: / moneycontrolcom
Instagram: / moneycontrolcom

Опубликовано:

 

20 июл 2023

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 391   
@vrushalidhongade5725
@vrushalidhongade5725 11 месяцев назад
Amazing job by the Metro Corporation and the entire team is IAS officers, civil engineers and metro workers!! This is so lovely :)
@Goodthingsviews
@Goodthingsviews Год назад
Good achievement for Mumbai.❤
@jeet2042
@jeet2042 Год назад
Good one . lets hope no court and no NGO stops the construction again and Lets Hope Shivsena UBT is out of Power so as we can have this ready
@akk424
@akk424 Год назад
Yes
@omkarjadhav4645
@omkarjadhav4645 Год назад
That's what I hate about these NGOs and their activities Now talking about NMSEZ which was proposed in Navi Mumbai in 2008-2009 nowadays nobody's talking about it and the plan has seen no progress since then as it has been put on halt because of some environmentalists Also in the primaeval times there was opposition during the time of construction of NMIA I do get their point but why always come in between that would literally put the development of the country in doldrums
@yashpalchaudhary9752
@yashpalchaudhary9752 Год назад
NGO are one of the hurdles in progress of country...and NGO get their majority funding from govt and foreign also.
@parikshitp7849
@parikshitp7849 Год назад
😅😅😅UBT out of power😅😅😅😅
@sandraf4590
@sandraf4590 Год назад
​@@parikshitp7849what is the full form of UBT?
@SaadAliArts
@SaadAliArts Год назад
Financial Capital and most populous city Mumbai deserves a dense, efficient and accessible network of Metro like Delhi. Love to see this development ❤🇮🇳🚇
@nanikmahbubani4256
@nanikmahbubani4256 Год назад
Should have been built 20 years back,but Maha CM^s busy with personal interest etc..
@COGNIZIO
@COGNIZIO Год назад
@@nanikmahbubani4256 exactly
@alley4126
@alley4126 Год назад
Mumbai already has local train, this is extra service!
@murtazbh827
@murtazbh827 Год назад
This shall definitely boost th IT industry in Mumbai
@monakandari6160
@monakandari6160 11 месяцев назад
​@@alley4126Those local trains should be all replaced with metros. People put these videos online and think trains around whole India don't have doors
@adivlogs141
@adivlogs141 Год назад
Imagine metros parallel to Local trains
@parikshitp7849
@parikshitp7849 Год назад
I guess parallel line would make no sense. Because the purpose is challenged there. The whole point is to distribute the burden of total human traffic and vehicular traffic.
@sohamrege9563
@sohamrege9563 Год назад
But it's not parallel or aligned to local trains. Many areas of Mumbai like Mumbai airport are not connected via local trains, which this metro line 3 connects via 2 underground stations, hence this underground line is very useful.
@robertdjr0
@robertdjr0 11 месяцев назад
​@@Hey1234Heywest east would be good after line2 completion and line 6.
@zachariahtitus1210
@zachariahtitus1210 10 месяцев назад
@@parikshitp7849absolutely right.
@shashankkulkarni993
@shashankkulkarni993 Год назад
Currently indian government doing fantastic job towards development of roads railways air water ways energy and defence sector is key for agriculture and defence sector Logistics and industries tourism Digital economy is one of best work done by current indian government
@rushabhpatel4291
@rushabhpatel4291 Год назад
The metro revolution in india started under UPA govt. it has considerably slowed down after that.
@bharatpurohit8331
@bharatpurohit8331 Год назад
@@rushabhpatel4291kaha se padhke ate ho?
@aniketpatel8089
@aniketpatel8089 Год назад
@@rushabhpatel4291 Haan bhai , us samay Bihar me bhi metro thi , lekin BJP ke aate hi gaayab ho gayi , bahut dukh hota hai ye dekhkar ki kaise Modi ji Patna metro ko KHAA gaye.
@johnmark6046
@johnmark6046 Год назад
@@aniketpatel8089 bruh😂😂🔥
@Asura11_
@Asura11_ Год назад
​@@rushabhpatel4291once a chamcha always a chamcha 🙂👍🏻
@friendeleven5711
@friendeleven5711 Год назад
Will Uddhav Thackeray pay the 10000 crore delay cost
@jastipradeep
@jastipradeep Год назад
An interdisciplinary engineering marvel
@FaithArise_
@FaithArise_ 11 месяцев назад
Hope the metro is successful and Mumbai can expand its metro network. ❤ Love positive progress like this.
@Azarath_Metrion_Zinthos
@Azarath_Metrion_Zinthos Год назад
Instead of praising random politicians who had no hand in building all these transits ..can we praise the engineers, architects & thousands of labourers who are directly responsible for this feat? Ms. Aswini is just an exceptional woman who knows her stuffs.🎉❤
@sohamrege9563
@sohamrege9563 Год назад
You damn funny, broa. 😂😂😂😂😂
@RameshBhai-qc8zt
@RameshBhai-qc8zt Год назад
Yes, don't praise the people who ensured this got done. The MVA stopped everything and remember, NDA votes got Ubata elected and he took those and worked against us. MVA was thunderstruck: billions of project outlay and "NO VASULI"... Hence they stopped it cold. Stole my vote and tried to steal my tax money.
@Mr.Bismarck
@Mr.Bismarck 11 месяцев назад
Na marathis hate these labourers, no appreciation will come for these so-called immigrants crowding Mumbai. It's sad and shit
@luckybansal-yn7em
@luckybansal-yn7em 11 месяцев назад
Feku will take credit for doing nothing..project was brainchild in 2004 ..central and state government was congress.. andh bhkt,dallal media and jootha feku will make this. An event of his credit
@TonyStark-lf1wj
@TonyStark-lf1wj 11 месяцев назад
😂😂 I think you don't like this government
@madhanganesan2558
@madhanganesan2558 Год назад
Mrs. Aswini, You and your team are doing a wonderful job. A very big applause to all of you.
@mypromopage4805
@mypromopage4805 Год назад
Great video, detail information provided
@thesavagecivilengineers9097
We DMRC is going to maintain & operate this line 3 for next 10 yrs...soon Staff coming from Delhi...🤘👷
@maharashtraengineeringadmi6428
Staffing will come and stay in slums
@thesavagecivilengineers9097
@@maharashtraengineeringadmi6428 ohh boy ! Poor knowledge always gonna take you in trouble..our organization very well take care of our accommodation . ✌️
@maharashtraengineeringadmi6428
@@thesavagecivilengineers9097 in Mumbai no one ensures the accomodation. This is not a village. Your stay will cost more than your salary.
@karanmadnani7723
@karanmadnani7723 Год назад
​@@maharashtraengineeringadmi6428that's not his headache. There will be at least a 100 like him and their accommodation will be factored in the overall scheme of things.
@saptarsi7868
@saptarsi7868 Год назад
mumbai and bangalore desperately needs a dense metro system which will lessen the burden from the roads. It's high time that we took traphic away from the roads and make our daily commuters journey hassle free
@jagroes3347
@jagroes3347 11 месяцев назад
Considering the challenges involved, this is without doubt an engineering marvel.
@vaibhav1069
@vaibhav1069 Год назад
Credit for Mumbai metro goes to only deva bhau.
@rushabhpatel4291
@rushabhpatel4291 Год назад
The metro revolution in india started under UPA govt. it has considerably slowed down after that.
@yuvrajphadatare6198
@yuvrajphadatare6198 Год назад
@@rushabhpatel4291 NO bro NDA atal bhihari vajpey start and congress goverment corrupt and stop all prj
@sav145
@sav145 Год назад
@@rushabhpatel4291 Is it?How many metros lines have UPA government constructed during their 70 year rule?Dont just spread propagand,show facts.
@rushabhpatel4291
@rushabhpatel4291 Год назад
@@sav145 Delhi metro, banglore metro, Chennai metro, gurgaon metro, kochi metr, lucknow metro and many others were built under upa. Also at independence our poverty rate was 90% and our literacy rate was 10%. Do you seriously believe the, to build metro first or schools first.
@sav145
@sav145 Год назад
@@rushabhpatel4291 Who said about building first?you are the one posting same comment over and over that metro revolution started during UPA government. Anyone can lay foundation stone and eat the money,but it takes BJP to complete those projects. So go and tell your propaganda to someone.
@atokimruk937
@atokimruk937 Год назад
Very good video and your commentary is easy to understand and concise. Keep up the good work. All the best !
@sohamrege9563
@sohamrege9563 Год назад
His commentary is good but the Mumbai underground metro line 3 is also good.
@ParthParab-cy1hx
@ParthParab-cy1hx Год назад
The underground metro station vakola junction stationsi s just near my house from last 6-7 years they are making it so now its nearing its completion is big relief to the people 😄
@sohamrege9563
@sohamrege9563 Год назад
It's great to know it's nearing completion. SEEPZ, the station nearest to my home in Mumbai, is also completed, and so are MIDC, Marol naka and both airport stations. 😀
@shubchatt
@shubchatt Год назад
Will be a great transport infrastructure for Mumbai. Excited that its just another year for commissioning
@sohamrege9563
@sohamrege9563 Год назад
Make that lesser than a year. 😅
@ashishkale6154
@ashishkale6154 Год назад
A very great example of of team dynamics and efficient management is Mumbai Metro and various other projects under the BJP leadership. At political level - coordinate and retaliate those who oppose the welfare projects of the people as they don’t get any money cut from the public exchequer hence they pour all their machinery to derail the project. Secondly, at beaurocratic level you need to deal with firmly and for that kudos to Ashwini ji for their immaculate experience and conviction. And lastly the overall leadership again by none other than Modiji for which we should thank for envisioning the growth of the Finance capital! ❤🎉
@SHIVAMKUMAR2
@SHIVAMKUMAR2 Год назад
It g😮gf
@luckybansal-yn7em
@luckybansal-yn7em 11 месяцев назад
Andh bhkt kise de gandi Aullad..this project was started in 2004 .. central government and state government was congress..how modi anything..how could sell assets,bjp could create rifts and riots..taking credit of others hard work is feku's job
@AmitSinghCRT
@AmitSinghCRT Год назад
Great News!! I have never been to Mumbai; but so happy to see this project completion. Will improve the commute of Lakhs of commuters.
@ayushparikh7151
@ayushparikh7151 Год назад
You guys forgot to mention the layer of garbage in the mithi river right above the soil layer.
@Banzybanz
@Banzybanz Год назад
And the layer of garbage that floats on the water.
@arunkottolli
@arunkottolli Год назад
Mumbai needs 1000+ kms of metro and be built within 10 years! The current plan is too slow and wasteful
@kamalsh6123
@kamalsh6123 Год назад
That will happen only if BJP is in power. We already lost 2.5 years because of MVA rule.
@sohamrege9563
@sohamrege9563 Год назад
You're amazing. I admire you a lot. Mumbai metro underground line 3is my most favorite. Keep it up, MoneyControl.
@flowzeta5412
@flowzeta5412 Год назад
Mumbai traffic is twice that of Bangalore's but Bangalore is more famous for it.
@coastofkonkan
@coastofkonkan Год назад
Mumbai drivers are better
@shan25873
@shan25873 Год назад
Mumbai's infra is way ahead when compared to Bangalore. That's why the impact of traffic in mumbai is less
@maheshj8435
@maheshj8435 Год назад
​@@coastofkonkanLoL. No. Mumbai has local, Bangalore not.
@shreyash_chouhan
@shreyash_chouhan Год назад
The good thing about Mumbai is that most of the people follow road etiquettes, and that makes the traffic organised.
@ZZZZZZ-eu7ui
@ZZZZZZ-eu7ui Год назад
@@shreyash_chouhan WHO SAID THAT ? mumbai corwd are worst 2 wheler try to get in where possible
@tusharvora2369
@tusharvora2369 11 месяцев назад
When Metro 3 will start it will be Big relief for Mumbai kar, Big relielf in Traffic.🙂
@sandraf4590
@sandraf4590 Год назад
Hi... Where would be the first station of this underground metro.? Is it from Goregon Aaryey road? Pls reply
@gretaaarons4941
@gretaaarons4941 Год назад
Hope it helps people who don't have direct rail connectivity to the suburbs and other business areas.
@papkenro
@papkenro 11 месяцев назад
Wow enjoyed traveling in Metro it’s a great experience and cheap compared to Uber and rickshaws 😊
@DrSongs-rg4ry
@DrSongs-rg4ry Год назад
Whole aqua blue line is phase which connects mostly parts of Mumbai n I have seen it the lines where this line is essential in connecting
@Jay-nk6dm
@Jay-nk6dm Год назад
these investments in mumbai metro will change mumbai in unbelievable ways. life will not be the same at all, and mumbai will experience unbelievable growth. metro lines like this dont even exist in the usa. great work india
@vdee101
@vdee101 10 месяцев назад
Yes because in USA they don't have congestion like this. This is so scary & ugly looking. Living in another state I'm dreading seeing whats become of mumbai, my home state. This is all too bad. All big buildings, ugly constructions, slums dirt filth? And now this metro? Adding to the ugly look and making the place look more congested?
@rajbirkar432
@rajbirkar432 Год назад
Can someone please explain why would the Mumbai metro run only at an avg speed of odd 30 km/hr (as per the commissioner’s estimates, it would take 60-70mins between SEEPZ and Churchgate distanced at 30kms) which can be considered as extremely slow in terms of metro system standards?
@PUNSHIBAROT
@PUNSHIBAROT Год назад
Metros are usually slow in speed because they have 1 station for every 1.1 km, considering too many stations + good halt time across big stations its surely will take time
@desibigfoot3874
@desibigfoot3874 Год назад
Risk of flooding of metro tunnels? Though entry and exit are above flooding level, the stations are like 20m below ground, right? Where there is a potential difference, there is always a risk, right?
@samcapital9047
@samcapital9047 Год назад
When cars are being bought on EMI how the traffic willl reduce.
@tan6660
@tan6660 Год назад
Double engine sarkar
@rajpawar9343
@rajpawar9343 Год назад
Without engine running using hands.
@rushabhpatel4291
@rushabhpatel4291 Год назад
The metro revolution in india started under UPA govt. it has considerably slowed down after that.
@rajpawar9343
@rajpawar9343 Год назад
Yeah and NDA will shamelessly steal credit.
@viniljain1733
@viniljain1733 10 месяцев назад
Jab metro bana start huvi thi tab main 1st grade main tha. Today I am in Bcom
@Akshay-vq1uv
@Akshay-vq1uv Год назад
please cover the metro work of other cities too.
@hammadshaikh4278
@hammadshaikh4278 Год назад
Great project 🎉
@rksreepansh
@rksreepansh Год назад
Give update on bullet train also❤
@ashishgupta3652
@ashishgupta3652 Год назад
What an irony.. we are hearing news metro line 3 almost completed but never completed from last 3 years. Delhi RRTS metro started 3 years ago and now completed.
@rishubsonker3174
@rishubsonker3174 Год назад
#Delhi rrts #priority section is #elevated, #metro 3 is #twice the length of priority section of #rrts & fully #underground. #Mumbai city is very congested so it's not that easy to construct a 33 km long #underground line obstructing the flow of traffic 🚦
@kamalsh6123
@kamalsh6123 Год назад
Are you aware that Mumbai Metro 3 was put in cold storage when MVA came to power in Maharashtra for 2.5 years? It has been BJP who was pushing the project and now that they are back the project will get completed.
@justarandomguywithoutaname8719
Underground construction is extremely time consuming. A system similar to rrts is being built in south korea, they started work years before rrts but they still are far away from completion, because they made it underground
@binny3727
@binny3727 Год назад
Superb
@zobr0s77
@zobr0s77 Год назад
FINALLYYYYY
@ArchanaVerma-hu7rs
@ArchanaVerma-hu7rs 10 месяцев назад
very informative
@Rahulwall
@Rahulwall Год назад
Special Thanks to Devendra Ji for Giving Push to Many infrastructure projects in Mumbai. 🙏
@vikrantm4958
@vikrantm4958 Год назад
L@da mera dravendra ji...bsdk ye kaam Congress ka pass Kiya hua hai..uss time se hi kaam chalu hai...samjha andh bhakt
@KishanKumar-qz1kt
@KishanKumar-qz1kt 11 месяцев назад
Yes 33 hactare forest land is taken but this metro line will compensate more than that by reducing veichle movement on roads
@Arpinaoptimus
@Arpinaoptimus Год назад
Do you even know how much time does one takes to reach Andheri station from Seepz.... Your question was comparing oranges to apples
@m5828.
@m5828. Месяц назад
Thanks to all the Men who made this 👍👍
@manasphanse6809
@manasphanse6809 11 месяцев назад
Exciting!!
@information1162
@information1162 Год назад
Barish me Pani to nahi bharega na isme ya barish k 4 mahine band rahega ye
@us2beckons
@us2beckons Год назад
mujhe to phir bhi Mumbai me underground lene waqt, kas kar monsoon me, dil me aisa dhak-dhak hoga re baba! 10 saal tak bharosa hi nahin thik se kaam kiye honge ya nahin. Kabhi dhah gaya to!!?
@rajeshkoppa2367
@rajeshkoppa2367 10 месяцев назад
Every district should have a airport in india .. and every town or tashil should have helipad .... these will boost the future travel and tourism
@gowthamhegde383
@gowthamhegde383 Год назад
Credit to devendra fadnavis.
@dhirendranegi293
@dhirendranegi293 Год назад
एक्वा लाइन, मेट्रो लाइन 3 के शुरू होने का बेसब्री से इंतजार है
@greattrainjourneys8076
@greattrainjourneys8076 Год назад
2 year MVA government was a disaster for Metro construction even Ms Ashwini was removed from her Post , all major infrastructure projects were stopped or delayed in Maharashtra under MVA .
@chetanrawool
@chetanrawool Год назад
Hope it doesn't get flooded everytime it rains like other infrastructure around Mumbai.
@cschandragiri
@cschandragiri 10 месяцев назад
Shiv Sena and Aditya Thackrey is responsible for the delays! They don’t care about the struggles of mumbaikars, their goals is to speak in air conditioned conferences in Geneva on climate change. Why didn’t Thackrey save national park land grabbed by builders.
@Arazorblade
@Arazorblade 11 месяцев назад
People can curse as much BJP government as they want but the speed of infrastructure and initiatives Modi Government and BJP state governments across states have taken is just amazing. Congress is only good at making plans and delaying it review after review and increasing the cost . I still remember the work on Pune Metro and how much its start was delayed.
@GoFlyFeetOnGround
@GoFlyFeetOnGround Год назад
what about flooding
@robby009
@robby009 Год назад
Well I truly Appreciate all the efforts of Government and Construction Companies and Project Associates for building such an amazing Infrastructure. But at what cost we are gaining this convenience is the most important aspect here. Firstly major part of aarey was eradicated which was a loss for ecosystem. Also many of roads were almost vanished which caused traffic a lot. Many of playing grounds and parks were digged which is quite understandable but they were not restored as it was before. So never forget the cost and sacrifice we have to give to enjoy this convenience 🙂
@arjunkadam1114
@arjunkadam1114 11 месяцев назад
in that case we should live in jungle as 100 -200years ago this much population not there. Shut you mouth
@vdee101
@vdee101 10 месяцев назад
Scary. Mumbai and India is fully doomed.
@yuvrajphadatare6198
@yuvrajphadatare6198 Год назад
Development man Devendra fadvanise ji Thank you bjp and metro team
@stevencastelino4175
@stevencastelino4175 11 месяцев назад
Please start metro from Dahanu road to Andheri
@kannappanr577
@kannappanr577 11 месяцев назад
This great lady(Mrs Ahswini Bhide) should be conferred with Bharat Ratna in the next Republic Day once this line becomes operational and ex-CM ( now DCM) Devendra Fednavis) should take lead and ensure that she gets it. She richly deserves.
@muzaffarnadkar2154
@muzaffarnadkar2154 Год назад
90 years before underground metro established in eurpe and america.india going to build it now.hpwever mumbai only doing good job in india.mumbai job well done yeah baby.
@us2beckons
@us2beckons 24 дня назад
9:00 Is Mithi river a river or drain?
@Ab-ii4oc
@Ab-ii4oc Год назад
why don't you interview LT engineers and project managers ...rather than interviewing stupid IS officers who all have zero knowledge abput the technologies involved
@kamalsh6123
@kamalsh6123 Год назад
I beg to disagree. Ashwini Bhide has been an exemplary IAS officer who has handled the project well and is highly knowledgeable of the full project. She was deliberately sidelined by Thakeray during the 2.5 years of MVA rule but has come back with renewed energy to complete the project.
@premsalian
@premsalian 11 месяцев назад
Great Maam
@binny3727
@binny3727 Год назад
Great
@user-eu9oe2fj2s
@user-eu9oe2fj2s Год назад
when will rest 15 percent complete by 2030 or 2040 or 2050
@yogeish
@yogeish 11 месяцев назад
6:11 what a stupid question is that !!!!! There are no trains from SEEPZ right now and to reach andheri station itself from SEEPZ is going to take around 40-45 mins in best case scenario with normal traffic and public transport like bus readily available.
@santukoar167
@santukoar167 10 месяцев назад
Super👌👌👌💪💪💪👍🎉🎉🎉
@socks4everyone
@socks4everyone Год назад
@this_fox_is_sly
@this_fox_is_sly Год назад
5:32 really doubt that
@aadityachourasia2124
@aadityachourasia2124 Год назад
Is it entirely underground or not ?
@mandarsawant7747
@mandarsawant7747 Год назад
Yes fully underground and emerges into Aarey depot at one end
@sayyedasad558
@sayyedasad558 Год назад
last 8 years it has been a stress to travel in mumbai due to mumbai metro work unplanned work every part of the city is dugged up
@ZZZZZZ-eu7ui
@ZZZZZZ-eu7ui Год назад
soon traffice will be reduced
@sunilmohandas912
@sunilmohandas912 Год назад
This will change the face of mumbai.
@akk424
@akk424 Год назад
Bjp has done a lot for the country’s infrastructure 👏🏼
@akk424
@akk424 Год назад
And no one even an andh namazi can deny it
@sameergudekar7519
@sameergudekar7519 Год назад
Crowd will not be lower by metro train more and more people will pour in. But it will reduce carbon emissions that's good.
@basshunterdota625
@basshunterdota625 Год назад
Jaldi banao yaar
@nikitsharma1554
@nikitsharma1554 11 месяцев назад
Lol... underground metros... I liven in delhi 20 years ago... They had amazing underground metro back then. And Mumbai is trying to build it now in 2023. Seems like Mumbai has a lot to catch up.
@kishanshinde2154
@kishanshinde2154 Год назад
😢where is our play ground and garden
@rohitharip
@rohitharip Год назад
4:08 Very confusing information when it comes to Aarey Forest! Mrs. Ashwini said that the total land is 1300 acres first, later corrected by saying hectares. Why have you shown 13,000 (THIRTEEN THOUSAND) hectares of land making 33 a very small number! very disappointing, at least get the numbers straight!
@aishwaryathakker8594
@aishwaryathakker8594 Год назад
Well done 👍🏻 Mumbai ab Metro ke mamle me bhi Sab se Aagey hoga 😊 Kyuki underground Metro sirf Mumbai me Shuru hui Hai India me Delhi me Nahi ab Bolo Delhi walon Hahaha🤣
@seemajha5488
@seemajha5488 Год назад
Kolkata has underground metro since 1984
@scientistterrific
@scientistterrific Год назад
Haha haha what a joke 😂😂😂 10 saal se tumhari stupid se metro BN hi rhi hai Delhi rrts completed in just 3 years Rapid metro completed in 2 years Aur jankari nhi ho to zyada bakbak nhi krte.......delhi ke total metro route me 1/3 underground hai Pehle research krte hai phir mu se hagte hai .... Kabhi delhi aaye nhi hoge na Aishwarya thakur issliye lagta tum soo hi the ho abhi
@manishpandey8302
@manishpandey8302 Год назад
Ashwani mam is metro woman of india
@avichanmayangade3914
@avichanmayangade3914 Год назад
ट्रॅक 1 है या 2 है 🤔
@manasdaruka
@manasdaruka Год назад
Is the anchor's claim correct that similar journey via locals will take 50% less time? If yes, that can be a really bad design decision
@aravind1994
@aravind1994 Год назад
Between 2 specific stations, it can be that way. And those people who make that specific journey will find local trains better. Doesn't mean the whole line is bad
@sayantanpal1991
@sayantanpal1991 Год назад
The anchor also mentioned it will connect to areas that don't have local train connection. There was also no comparison with road traffic in which I think metro wins.
@mandarsawant7747
@mandarsawant7747 Год назад
Thats point to point. Some people take 30-40 mins for travelling from their house to Andheri station. That makes it more time than metro
@ashwingiri1510
@ashwingiri1510 Год назад
Bhai no local train goes to arey colony you have to take rickshaw from station or metro only , this line ensures there is only single connectivity so reducing the overall time, the anchor twisted the question.
@cuteyrahul
@cuteyrahul Год назад
Metro has more stations
@Nandan_Singh.
@Nandan_Singh. Год назад
Bro is newly hired employee.
@xolo6796
@xolo6796 11 месяцев назад
Nice but this is not a world class metro infra. No lighting and decorations in station. Just a metro station..
@chandlerbing700
@chandlerbing700 Год назад
What about flooding of underground rail during rain ?,
@sanjaymungi7069
@sanjaymungi7069 Год назад
Looks like you are asking for the sake of it. The anchor has already expressed your concern in the video at 5.30 and Ma'am has clarified the same. Make an effort to at least see from the point of time I have mentioned
@chandlerbing700
@chandlerbing700 11 месяцев назад
​@@sanjaymungi7069 thx. I just had this query so I searched you tube videos, watched a few and skipped a few but commented on each so that someone who would know would respond and I got your response.
@ashokpardasani
@ashokpardasani 9 месяцев назад
Better by 2023 complete phase 1 and phase 2.
@mayurkanth6987
@mayurkanth6987 Год назад
DPR started in 2011 but contruction only started in 2016 end. This shows why China raced ahead of India in every sector. In those 5 years, China builds thousands of kms of metro length
@amitgangwani1816
@amitgangwani1816 4 месяца назад
Heard some news of major corruption practices happening in Mumbai Metro. I wonder if it's true but a lot of big names must be involved. Amount is 33000 crore
@decay0107
@decay0107 Год назад
Ma'am is an example of 21st century Queen. Ma'am yeh aapka crown lijiye 👑
@rahul.modi30
@rahul.modi30 10 месяцев назад
60-70 mins for a 35 km stretch!???? sure with stops, but still wth
@rajunaik26
@rajunaik26 Год назад
If penguin and his father comes back to power then Tata bye bye Mumbai infrastructure
@banditonehundred
@banditonehundred 10 месяцев назад
Ticket prices are very high 😆 says no one
@rakeshramachandra2654
@rakeshramachandra2654 Год назад
Great work under Modiji's leader ship, bullet train, dedicated frieght corridor also connecting mumbai, congratulations to engineers who working there and contributing nation. It's all indeed for 5 trillion dollar economic dream,
@luckybansal-yn7em
@luckybansal-yn7em 11 месяцев назад
Oh really andhbhkton..under ground project was started in 2004..A 20 km (12 mi) metro line from Colaba to Bandra was announced in January 2004, as part of a master plan unveiled by the Mumbai Metropolitan Region Development Authority (MMRDA). The plan encompassed a total of 146 kilometres (91 mi) of track, of which 32 kilometres (20 mi) was proposed to be underground. The MMRDA unveiled plans for an extended Colaba-Bandra-SEEPZ metro line in 2011. According to its earlier plans, a 20 km (12 mi) metro line from Colaba to Bandra was to be constructed, running underground for 10 kilometres (6.2 mi) from Colaba to Mahalaxmi, and then on an elevated track from Mahalaxmi to Bandra. The MMRDA decided to extend the line to the Chatrapati Shivaji International Airport to increase ridership. The 33.5-kilometre (20.8 mi) Colaba-Bandra-SEEPZ line was estimated to cost ₹21,000 crore (US$2.6 billion),[21] have 27 stations, and would be the city's first fully underground metro line.[22] at Nariman Point, BKC, MIDC, SEEPZ, and elsewhere.[23] According to the MMRDA, an underground metro will minimise land acquisition and disturbance to traffic during construction compared to an elevated metro.tumhara Abba Credit lene ajta bus
@wallvid
@wallvid Год назад
60 minutes? that is a ridiculously long
@idemonstratevelocity3522
@idemonstratevelocity3522 Год назад
this is subway system will change everything
@gsmp3744
@gsmp3744 Год назад
Which language is he speaking in ?
@sourabhjain55
@sourabhjain55 Год назад
Nehru ji❤ thnku
Далее
Your bathroom needs this
00:58
Просмотров 17 млн
Why India is Building ₹1,80,000 Crore Bullet Train
21:57
Most Useless Megaprojects in the World
16:31
Просмотров 48 млн
Why Mumbai is Building Its Biggest Metro Network
8:58