Тёмный

Brand new Stadler Sali Locomotives on the FGC network at Cornellá - July 2023 

HSTHoward
Подписаться 9 тыс.
Просмотров 1,8 тыс.
50% 1

In May 2023 the Stadler Sali dual mode locomotives entered traffic on Barcelona’s FGC, narrow gauge network, sadly replacing the GM engined locos, which I missed by 2 months! However seeing these fabulous looking brand new locos was great to see, in their striking green and silver livery. Recorded at Cornellá on the outskirts of Barcelona on the 6,7 & 8th of July 2023, I managed to see 4 out of 5 locos. The main traffic on the line is potash & automotive trains as seen here.
Locos seen are 257.01, 257.02, 257.04 & 257.05.
Enjoy!
#spain #trainspotting #stadlersali #stadler #eurodual #fgc #barcelona #freighttrain

Авто/Мото

Опубликовано:

 

25 июл 2023

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 7   
@NickBurman
@NickBurman 11 месяцев назад
Slight correction, FGC hauls potash, not phosphate. It's interesting to know that when FGC was still private, one of its main shareholders was Solvay.
@Martin_TrainSpotter
@Martin_TrainSpotter 10 месяцев назад
Very beautiful locomotive!
@SimonTog
@SimonTog 11 месяцев назад
Great video Howard :)
@pawegliszczynski4449
@pawegliszczynski4449 11 месяцев назад
Good😊
11 месяцев назад
I believe FGC decided to purchase 5 locomotives like these in order to have more efficient traction (SALi-derivated locomotives are electric and diesel, so in the main line between Sant Boi and Manresa it's not necessary to have diesel traction especially on some underground stations). The original 3 GM locomotives -designated as class 254, Stadler locomotives are class 257- had to push freight trains of 200-400 meters-long, which would be one of the longest narrow-gauge freight trains in Europe (I don't know longer and heavier trains in the continent). Just to know: now there are two type of freight trains running on working days, Seat cars from Martorell factory to Barcelona Port and potash trains from Súria mine -north of Manresa- to Barcelona Port (so you get 3 trains per day of each one running between regular passenger trains).
@HSTHoward
@HSTHoward 11 месяцев назад
Thank you!
@jurassicrailfan
@jurassicrailfan 9 месяцев назад
FGC purchased them because the 254s were almost 29 years old when the order was placed and they needed more rolling stock since they had plans to increase their freight traffic and 3 locomotives from 1990 and +70 hopper wagons weren't enough to meet the predicted demand. also the length isn't entirely correct, FGC usually runs 20-21 wagons on their trains, 25 at most if they're empty, which is around 350 m, locomotive included. they're ATM the longest narrow gauge freight trains (in Europe), but FEVE used to run also 20-25 car long freighters back in the day
Далее
Revolution auf Gleisen - EuroDual
6:48
Просмотров 38 тыс.
Поезд STADLER в Казахстане
22:47
Просмотров 886 тыс.
The Fascinating Engineering behind Electric Trains!
8:58
Australian Railways Are NUTS!
19:27
Просмотров 756 тыс.
HERMOSA LOCOMOTORA 257
15:30
Просмотров 4,8 тыс.
Stadler Euro Dual im Einsatz
5:45
Просмотров 46 тыс.