The engineer/mechanics were on scene pretty quickly thankfully but what may have prevented passengers from being held up further, would have been to transfer the passengers and driver from the broken down E200 to 36960 (replacement one) and continue the route. This would allow the engineers/mechanics as much time as they need to figure out what the problem was and return the bus to the depot. Did you catch what was being said at all?