I think the way you selected banks, at 29:00, to import into HEC RAS is not correct: Left and Right banks are determined by looking downstream on a drainage draw, river, creek etc and then deciding which bank is on either side.. Nothing against what you have in this tutorial, it is very useful. Thanks a lot for posting this video !