👇🏼🧾🕐Timestamps for all the installation steps are listed below 🕐🧾👇🏼
In this video, we improve DORA's looks and functionality by upgrading the sounder system with two LOWRANCE Elite 9 Ti2s.
Timestamps:
0:00 - Introduction
1:00 - Unboxing
3:57 - Disconnecting Battery
5:07 - Removing Old Sounder
7:30 - Placement of a New Sounder
9:58 - Planning wiring Sequence
11:52 - Drilling holes for cable routing
13:40 - Routing Transducer Cable
15:20 - Mounting Brackets to Transducer
17:48 - Mounting transducer to Hull
17:56 - Connecting Blade fuse to power cable
22:03 - Re-wiring the blade fuse so we can fit everything through the routing holes
22:52 - Connecting power cables to BUS Bar / Switch Panel
24:25 - Initialising power to the cables
25:30 - Quick tips for plugging cables into the MFD
26:47 - Powering up for the first time!
Stay up-to-date with all the changes, big and small. Like us on Facebook, Subscribe on RU-vid and Follow us on Instagram.
Stay tuned for more, Grifters!
👍Facebook: Grift.Co
📷 Instagram: grift.co
🎥RU-vid: / griftco
💌Subscribe to our RU-vid Channel: goo.gl/pzQNVV
20 июл 2024