Here are more information on the technical layout of my inverter setup.
- 8kVA DEYE hybrid inverter
- Stage 2 (7.68kWh, 1C) VOLTA battery
- 2 Strings of 4x 550W JA solar panels
(more panels will be beneficial during winter)
50A breakers to inverter
40A breaker from inverter
40A ELU before Essentials loads
25A ELU (or 2P breaker) to Smart Load
Geyser 1 - 150L - 3kW
Geyser 2 - 200L - 2kW (replaced element)
Auto change-over switch to geyser with
- Smart Load feed
- Grid feed via Smart Timer
(set via App on rainy days)
Relay - powered by geyser no.1's power from element (after thermostat)
Relay switches geyser no.2 off when no.1 is on
and visa versa.
Timer unit on main Smart Load output to limit usage time to between 10am - 3pm
(prevents unnecessary use of battery by
Smart Load in late afternoons)