At the bottom of Punt Dal Gall dam, at 115 meters deep and after 50 years of operation, bottom outlet and intakes have to be rehabilitated for both power generation and water supply of downstream river
Hydrokarst is responsible for underwater work. For this project, divers worked at 115 meters depth which was a real challenge.
Hydrokarst carried out:
- Pumping and dredging work at great depth: -110 m, 2500 m3 of sediment
- Hydromechanical work: design and installation of two packers - 15 and 14 tonnes
- Underwater work on civil engineering structures a 110 m depth - Scouring / Anchors / Core drilling
- Inspection of the bottom outlet tunnel
SATURATION DIVNG:
Saturation diving equipment is property of Hydrokarst, specialized in deep diving interventions.
Once pontoons are set on the reservoir, the saturation diving system is installed on the pontoons. Chambers and technical units are connected to operate the saturation diving system.
One of the main components, the diving bell, insure the transfer of divers from living habitat on the surface to the work area at the bottom.
TIME LINE:
Introduction: 00:10
Equipment: 00:50
Saturation diving equipment installation: 01:30
Work presentation: 02:28
Dredging work presentation: 03:10
ROV exploration: 04:35
Hyperbaric medical support: 05:30
Saturation diving work presentation: 06:15
Saturation diving gas regeneration system: 07:58
Bulkheads installation: 08:40
LINK:
If you are interested about saturation diving techniques, check out:
- Our reference: Punt Dal Gall project : www.hydrokarst.fr/en/referenc...
- Our last publication for Hydro 2018 conference in Poland about benefits of saturation diving for bottom outlet rehabilitation: www.hydrokarst.fr/en/referenc...
- Our video: World premiere, saturation work for maintenance operations in TBM - Hong Kong : • Saturation works for m...
FOR MORE INFORMATION:
www.hydrokarst.fr/en/

Наука

Опубликовано:

 

21 янв 2019

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
How Do You Steer a Drill Below The Earth?
14:53
Просмотров 4,1 млн
شربت كل الماء؟ 🤣
00:31
Просмотров 13 млн
ПОЮ НАРОДНЫЕ ПЕСНИ🪗
3:19:41
Просмотров 1,9 млн
The slide no one wants to ride at Hoover Dam
0:23
Просмотров 2,4 млн
Strontia Springs Dam repair
2:50
Просмотров 14 тыс.
Barrage de l’Hongrin - "Opération Vannes de Fond"
27:33
Nuclear Power Plant Safety Systems
11:36
Просмотров 2,8 млн
Biggest Megaprojects Under Construction in 2024
20:25
Просмотров 542 тыс.
How are Underwater Structures Built?
8:18
Просмотров 6 млн
Здесь упор в процессор
18:02
Просмотров 373 тыс.
iPhone socket cleaning #Fixit
0:30
Просмотров 14 млн