PILING DRIVING VIBRO STYLE, New Synthetic decking dock and boathouse construction 

Dale’s Marine Construction Inc.
Подписаться 7 тыс.
Просмотров 12 тыс.
50% 1

On this project I show the start of the layout of the dock and deck and construction with the synthetic decking along with the boathouse to boatlift completion.

Хобби

Опубликовано:

 

15 апр 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 32   
@UPutTheGayInGangster
@UPutTheGayInGangster 3 года назад
Beautiful project, Dale. Thank you for posting.
@johncanty9059
@johncanty9059 2 года назад
What size Excavator and vibratory are you using.
@davidhook261
@davidhook261 3 года назад
Great! Thanks so much Dale! Keep the videos coming!
@DaleWHickman
@DaleWHickman 3 года назад
Thanks David I’m trying to put them together when I have time been pretty busy here 😃
@justindc3124
@justindc3124 3 года назад
Great Work Dale !!!
@DaleWHickman
@DaleWHickman 3 года назад
Thanks Justin we have a great team effort on this project 👍
@lb7wade518
@lb7wade518 3 года назад
Great job!!
@DaleWHickman
@DaleWHickman 3 года назад
Thanks Wade I think the guys knocked it out of the park on this one good clean job 💪
@mmanut
@mmanut 2 года назад
DAMN, U GUYS DO GREAT WORK ‼️🛠️ Vinny 🇺🇸
@alananderson2961
@alananderson2961 5 месяцев назад
Awesome job 👏👏👏
@DaleWHickman
@DaleWHickman 5 месяцев назад
Thank you! Cheers!
@Paulie1232
@Paulie1232 3 года назад
Hey Dale great job as always. I have two questions for you. What would you estimate the weight of a 6" post @ 16 feet. I'm seeing answers all over the place and what would the average charge be to drive 8 posts of the same as listed above.
@DaleWHickman
@DaleWHickman 3 года назад
Hey Paul really all depends on the time of treatment and how much the Pilings has dried out but it could be anywhere from 125 pounds to 80 pounds. Typical charges for pilings usually go in foot increments $8.00 per foot up to $10 per foot also different charges for different types of soil conditions.
@allendabold5611
@allendabold5611 7 месяцев назад
I'm considering putting something like that at my place what is the cost of that job
@DaleWHickman
@DaleWHickman 6 месяцев назад
Thanks for watching my channel and your question. Sorry, but I do not like to discuss pricing on the Internet for my competition to find out my price points.
@michaelmixon2479
@michaelmixon2479 Год назад
If the attachment that does the vibration on the piling had a grabber unit like the logging industry uses for tree cutting, I think you would have much more control on the piling. Just a thought.
@DaleWHickman
@DaleWHickman 8 дней назад
Thanks for watching my channel in your comment you were absolutely correct. I would love to have something like that. It Just adds additional weight to the end of the boom and then I would need a larger tractor which I’m starting to get oversize on my barges. Thanks again.
@user-mg5sf5im3f
@user-mg5sf5im3f 11 месяцев назад
Dale, I’ve been doing alot of seawall work in Michigan, I’m still learning, lakefront property’s they should be with steel pipe and steel frame correct?
@DaleWHickman
@DaleWHickman 11 месяцев назад
Hey, thanks for watching my video in your comment. I don’t do any stihl Work down here cause we strictly deal with Sand so steel it’s not really necessary. We do a lot of vinyl seawalls and Woods seawalls and riprap. Good luck with your projects.
@geowhjr
@geowhjr 3 года назад
Nice video! Wondering if you used hurricane roof ties?
@DaleWHickman
@DaleWHickman 3 года назад
Hey GEORGE you got a good eye right there! There’s actually a beam on the outside and the lifter beams on the inside the hurricane clips are on the inside of the Roof beam where you can’t see them because it’s hidden by the lifter beams. Thanks for watching and commenting!!
@lloydhavekost4611
@lloydhavekost4611 Год назад
Dale, admiring your equipment, what is the name of the attachment that drives the pilings? Did you have to custom order it, I don't see that at the equipment rentals in my area. Thanks
@DaleWHickman
@DaleWHickman Год назад
Thanks for watching a video. I use an MTX on the smaller hoe’s and the Catapiller vibratory plates on the larger
@shenoyglobal
@shenoyglobal Год назад
can those posts in the water have plastic sleeve to protect it from elements?
@DaleWHickman
@DaleWHickman Год назад
Thanks for watching my channel. I appreciate it. Yes we do offer that as an option as well.
@deaconoriginal3149
@deaconoriginal3149 Год назад
What would I use to set pilings thru limestone? What auger? Is limestone jettable?
@DaleWHickman
@DaleWHickman Год назад
Thanks for watching my channel Deacon, if you’re talking about, saw the limestone, we don’t run into that situation down here so I would not be the best person to ask. Although we do have to sit pilings to limestone rocks, which is not fun, we just have to keep vibrating and using a jet pipe trying to get the rocks moved all the way sometimes I even use a diver to help move the rocks rocks
@augustreil
@augustreil 3 года назад
What a nice job Dale. Why don't the dock owners leave the pilings long so they or you can build railings off them ? Thanks and thumbs up. I see Chief the Foreman was there !
@DaleWHickman
@DaleWHickman 3 года назад
Hey August good to hear from you we present several different options when proposing the job and this is the option the customer chose, one issue with polls up and rails down here is during a hurricane a lot of trash will get hung up on the top as well. But we still do them they just look good. Yeah my wife said I need to start putting Chiefly in more of the videos I probably get more likes and comments and subscribers she’s right LOL my wife knows best!
@augustreil
@augustreil 3 года назад
@@DaleWHickman, Thanks Dale. I would think customers would want a big, fat rope strung between them or something, but I guess that's just me, lol.
@joegremillion1488
@joegremillion1488 Год назад
Dale, what size and brand is the vibratory plate for this video please.
@DaleWHickman
@DaleWHickman Год назад
Hey Joe thanks a lot for watching my channel I’ve had a lot of local competition copying what we’re doing so I don’t want to give out too much personal information I’m sure you could understand thank you 😊
Далее
HOW TO BUILT A HURRICANE BUSTER SEAWALL!!
14:01
Просмотров 11 тыс.
GAZEBO LAKE DOCK 2 DOCK BUILDING
17:51
Просмотров 7 тыс.
ОСКАР И ДЖОНИ БРОСИЛИ НАС 😭
01:00
Телеграмм-Колян Карелия
00:14
Просмотров 184 тыс.
PILE DRIVING BARGE MAKEOVER
6:40
Просмотров 946
WATERFRONT SEAWALL PROTECTION
15:23
Просмотров 4,6 тыс.
EXTREME BACKYARD RETAINER WALL MAKEOVER
26:09
Просмотров 3,6 тыс.
PILE DRIVING AND A ON LAND BOARDWALK
19:43
Просмотров 2,3 тыс.
Pile driving for boat lift and dock extension
5:01
Просмотров 15 тыс.
Building a driveway entrance
28:31
Просмотров 149 тыс.
Эй Рамазан # DamirAgroDizel
0:17
Просмотров 7 млн
KINDNESS ALWAYS COME BACK
0:59
Просмотров 131 млн