Тёмный

RED DEVIL - Restoration - Part Eight 

Wayne Nauschutz
Подписаться 9 тыс.
Просмотров 3,7 тыс.
50% 1

During Part Eight the superheater elements are removed and pressure tested. Western Cape, South Africa.
South African Class 26, No 3450 affectionately known as the Red Devil originally started life as a standard class 25 Non-condenser built by Henschel in 1953, works number 28769.
The class initially suffered a number of teething problems with their connecting rod bearings and valve gear. This lead to a redesign of the cross-heads and the fitment of larger bearings from other manufacturers.
The NCs soon went on to prove themselves as some of South Africa's most capable and reliable mainline steam locomotives with many seeing service well into the early 1990's. They still considered one of the largest non-articulated narrow gauge steam locomotives ever built.
Political motivations, strategic locomotive reserve or the looming oil crisis are a discussion for another time and place. I believe it worth mentioning that the Red Devil existence can almost exclusively be attributed to David Wardale, Livio Porta and the many workshop and footplate personnel that took interest in the project and not necessarily the SAR.
Wardale's work was met with a fair amount of resistance from the SAR hierarchy with many believing the project to be a waste of time and money on traction that they already considered obsolete. Many also believed that steam had reached its full potential and weren't keen to accept that their own work could be improved upon. If it wasn't for Wardales's rather ask for forgiveness than permission approach the project most likely would have seen untimely demise.
With that being said the Red Devil wasn't perfect, prototypes seldom are, but it proved the principles were sound and the hope was that it would lead to the development of entirely new class designed from the ground up deploying those principles.
Despite the time and effort invested in its creation, the Red Devil was simply too complicated and soon fell out of favour with maintenance and footplate crews. Many of which simply refused to learn how to operate it correctly and this quickly lead to a false perception that the locomotive was a poor performer and no better than a standard 25NC.
With Wardale leaving the SAR and nobody to look after it, crews took upon themselves to remove many of the modification some of which were specially manufactured. There are however a number of structural modification that could not be removed and these are still visible on the locomotive today.
Wardale's book is a must-read for any serious enthusiast, if not for the story, read it for the truth. The improvements done during its conversion ultimately lead to 28% coal saving, 30% water saving and a 43% increase in drawbar power. During its peak, the Red Devil had a maximum power output of 5030 hp at 100km/h.
3450 has been in storage for nearly two decades but has now been leased by Ceres Rail Company that have moved the locomotive to Worcester for restoration. Western Cape, South Africa.
List of improvements.
- Lempor exhaust.
- Addition of ten super heater flues and elements.
- Larger super heater header salvage from GMA.
- Feed water heater.
- Lengthened smokebox.
- Improved cylinder and valve lining lubrication system.
- Piston valves.
- Articulated valve spindles.
- Valve liner cooling system.
- Streamlined steam ports.
- Herdner starting valves.
- Altered Walschaerts valve gear.
- Enlarged steam chests.
- Improvement steam pipes
- Improved pistons
- Improved piston and valve rod packings.
- Improved insulation.
- Variable stroke lubricator drive.
Further Reading: Red Devil -en.wikipedia.o...
Ceres Rail Company - www.ceresrail.c...

Опубликовано:

 

2 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 10   
@sirbarongaming2138
@sirbarongaming2138 2 месяца назад
From all of the hard work to the locomotive sitting outside Cape Town What a shame 😢, I would love to see her under her own power again
@struck2soon
@struck2soon 6 лет назад
Great footage again Wayne. Slightly concerned that they are only doing this at such a late stage in the restoration...after a lot of the cosmetic work has been done? Good to see that some of the old tools are still available for use!
@WayneSA85
@WayneSA85 6 лет назад
Thank you. The equipment only exists because Bobbie Rudman made sure it was put into safe storage almost two decades ago. He's the gentleman seen speaking at 2:50. The cosmetic work was started early because it was the only thing that could be done with the limited equipment and spares they had at the beginning of the project. Other equipment was brought down after the work in Worcester had already commenced. The restoration crew are 350 kilometres from home and living in coaches inside the depot. Naturally, they want to get home as soon as possible so no time was wasted waiting for tools or spares, they simply continued with cleaning and painting something they could do with materials sourced locally.
@struck2soon
@struck2soon 6 лет назад
Wayne Nauschutz perfect answer Wayne, makes sense. Most interested to hear about the crew's situation, I had assumed they were just attached to the depot. Full respect to Bobbie for saving those vital tools...give him a kiss from me next time you see him please?😅
@jdftrains3507
@jdftrains3507 6 лет назад
So nice to see it looking super shine........ Nearly
@WayneSA85
@WayneSA85 6 лет назад
Thanks for watching.
@stephensmith799
@stephensmith799 6 лет назад
Those elements are wonderful pieces of ironmongery and looked to be in a really good condition for components that go through hellfire for hours on end.
@WayneSA85
@WayneSA85 2 года назад
The locomotive has been returned to storage after multiple failures regarding those elements. Thanks for watching
Далее
RED DEVIL - Restoration - Part Nine
8:44
Просмотров 5 тыс.
Учёные из Тринидад и Тобаго
00:23
Trevithick 1802 locomotive
5:58
Просмотров 13 тыс.
Red Devil - Inaugural Run - Part One
5:38
Просмотров 3,1 тыс.
COVID-19 Collaboration with Piet Conradie
13:09
South African GMA/M Beyer-Garratt 4126 at Creighton
2:08
Red Devil - Inaugural Run - Part Two
5:21
Просмотров 7 тыс.
3kV GiANTS - Part One - South African Class 6E1
8:10