This video is about the Mason 280(L) battery pack assembly complete with an active balance board
First, battery voltage and internal resistance test.
Then, stick EVA foam and PC shim on the cells and Stick epoxy plates on the box wall.
Next, place the battery cells in order, install the middle plate panel, and place the aluminum bar.
Step-by-step tips based on the video, then you can get the Mason 280 battery pack assembly complete and experience the fun of DIY at the same time.
This portable energy solution is perfect for you.
Don't let anything hold you back - embrace the freedom of Seplos 280(L) with smart BMS.
More detail: bit.ly/3lFE4Oc
If you have any other questions, please get in touch with us at: info@seplos.com
----------------------------------------------------------------------------------------------------
Get connected with us
Official website: www.seplos.com/
Facebook page: / seplostechnology
Instagram: / seplos_technology
Pinterest: / seplos_technology
Telegram: t.me/joinchat/SisDwbzfPLw2NDVl
WA Business: wa.me/message/AQKQF2AGRDHIK1
----------------------------------------------------------------------------------------------------
5 дек 2023