Тёмный

Visiting the VAT-leaching ponds at Khazaine gold processing plant in Sfariât, Mauritania. 

Gold Hunter Exploration - Sheikh Kamarul Azmi
Подписаться 1,2 тыс.
Просмотров 1,5 тыс.
50% 1

Our first order of business at the Khazaine HQ compound in Sfariât, Tiris Zemmour Region, Mauritania, is to visit their gold processing plant. Gerak Darma's team started by looking at their VAT-leaching ponds. The ponds were dug and then lined with HDPE film. The next step is to lay all the pipes to collect the leached liquid. After that, gravel was spread as the support layer, followed by gunny sacks as the filter layer. Once all that is done, the gold tailings/gold-bearing ores will be put in. The leaching solution will be added once the ponds are filled with tailings/ores. Leaching time in the pond is around 12 to 14 days. Later, we will continue to be brief on the collection pond for the pregnant solution and the leaching solution mixing pond. The construction of all these was done in-house. Kudos to Khazaine's team.

Опубликовано:

 

6 ноя 2023

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 2   
@goldhunterexploration-shei5873
@goldhunterexploration-shei5873 8 месяцев назад
VAT leaching ponds in Sfariat, Tiris Zemmour Region, Mauritania.
@zulli3534
@zulli3534 4 месяца назад
Jln jauh...😂
Далее
아이들은 못말려 〰️ With #짱구
00:11
Просмотров 514 тыс.
Rock gold ore process plant in Zimbabwe Africa
3:22
Просмотров 13 тыс.
underground cable work 132kv
0:45
Просмотров 8