A rare look at the frame exchange between Wabtec's building 60 and the EEC. This shows that indeed the 2 work together but as separate operations. Building 60 does work on the inbound frames before they head over to be completed in building 10. Along for the ride is CSX 7571.
#wabtec #east #erie #csx #csxtransportation #train #switching #frames #norfolksouthern #rail #transportation #locomotive #test
10 апр 2024