Accelerating Mix Designs for Base Material 0-7027 

TxDOT
Подписаться 12 тыс.
Просмотров 93
50% 1

TTI researchers developed a rapid mix design method for cement-treated base (CTB that reduces the test turnaround time for strength results from 7 to 4 days, as well as reduces the material quantity required for the strength testing. Given this project’s scope and data, the accelerated mix design procedure for CTB is suitable for road-mixed or stockpiled base materials. Researchers recommend that the mechanistic check from this project be added to the Texas Flexible Pavement System. The full research report provides a framework for how this mechanistic check could be efficiently implemented.
For more information on research project 0-7027, check out the TxDOT Research Library project record here:
library.ctr.utexas.edu/Presto...
For access to all TxDOT research, please visit the TxDOT Research Library at ctr.utexas.edu/library/

Опубликовано:

 

10 июн 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
His reaction 😳 (via @kaitlyn.b0506/TT) #shorts
00:10
Golden Glades Interchange Enhancement Project Video
6:52