CLH TYPE lift height 12M or less
(6M for double chain type)
STEP.01
Remove the split pin and plain washer on one side of the CHAIN BOX HANGER PIN and separate the CHAIN BOX HANGER PIN from the body.
STEP.02
After putting the chain in the chain box, hang the CHAIN BOX HANGER to STAY BOLT A of SIDE PLATE.
STEP.03
Align the hole of the side plate with the side of the CHAIN BOX HANGER, insert the HANGER PIN, and then attach the plain washer and the split pin.
Chain box installation method
CLH TYPE lift height over 12M
(6M for double chain type)
STEP.01
Separate both split pins and plain washers on each ends of STAY BOLT A.
STEP.02
Remove the CHAIN BOX SUPPORT PIN assembled on the lower part of the body.
STEP.03
After putting the chain in the chain box, hang the hand chain of the chain box on STAP BOLT A.
STEP.04
Assemble the plain washer and the split pin removed from the initial STAP BOLT A in order.
STEP.05
After passing the CHAIN BOX SUPPORT PIN through the chain box ring and body, assemble the plain washers, nuts, and split pins in order.
DSA TYPE chain box installation
STEP.01
Remove the CHAIN BAG SUPPORT PIN assembled on the lower part of the hoist body.
STEP.02
Put the chain in the chain box and hang the hand chain on the chain bag support metal.
STEP.03
After passing the CHIAN BAG SUPPORT PIN through the chain box ring and body, assemble the plain washers, nuts, and split pins in order.
Precautions when installing the chain box
01 After installing the chain box, lubricate load chain using the oil enclosed with the product.
(It affects load chain wear, noise and load chain life depending on whether oil is applied)
02. Do not inject the oil enclosed with the product into the gear case as it is for load chain lubrication (Gear oil is buffered when shipped)
03. Apply appropriate chain box size depending on hoist’s lift height
(We do not take any responsibility for accidents caused by the use of chain boxes that do not fit properly.)
22 апр 2020