We're getting started on a 3,000SF farmhouse duplex, on a lot that is going to make the building process much more difficult. With overhead powerlines, a foundation that sits a whopping 12" away from a block wall, we've got our work cut out for us.
Tool List: www.amazon.com/shop/mattbangs...
Connect with me:
_________________
Instagram: / mattbangswood
RU-vid: / mattpanella
FaceBook: / mattbangswood
Hammr: www.hammr.com/matt
Sponsors:
__________
Ariat 10%: ariat.dkkdet.net/c/2029241/69...
Diamondback Toolbelts: www.toolbelts.com/
BAD Workwear: www.badworkwear.com/
(CODE: "MBW10")
#construction #building #carpentry

Хобби

Опубликовано:

 

8 мар 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 251   
@MattBangsWood
@MattBangsWood 3 года назад
Can you guess how many yards we poured? I'll post the answer here in a few hours.
@Brandon-td2sm
@Brandon-td2sm 3 года назад
47 cubic yards?
@andreleblanc1963
@andreleblanc1963 3 года назад
19 yards
@Mfurze90
@Mfurze90 3 года назад
27
@yadielcarrasquillo6455
@yadielcarrasquillo6455 3 года назад
50 yards
@kipcarroll5644
@kipcarroll5644 3 года назад
80 yds
@saulmoreno3252
@saulmoreno3252 3 года назад
I haven't seen this type of footings poured. I've seen mono, block and slab on grade. Up here we usually do footing and stem wall with concrete forms to help control the amount of material used. Either way keep up the killer work!!!
@TALONTEDGUY
@TALONTEDGUY 3 года назад
Concrete waits for no man...Big Facts. God bless the finishers.
@dennisdavila1869
@dennisdavila1869 3 года назад
Great series on footings and foundation set up and concrete pour! You did a great job vibrating the concrete!,👍 5 nine yard trucks and 5 yard clean up guessing 50 yards.
@alexclaassen664
@alexclaassen664 3 года назад
Another great video brother! Appreciate the time you put in these videos for us! 🙌👏👏
@framnerdan
@framnerdan 3 года назад
Hi Matt. Always get a kick out of how you and your crew get to leave the plan on the table UNATTENDED! We have no such luxury here in Southern Alberta. Great videos again. Take care
@T.E.P.
@T.E.P. 3 года назад
great video ... the channel keeps growing and growing and the content is always informative and a good watch
@FreeMenLiveHere
@FreeMenLiveHere 3 года назад
Wish our guys wrapped the anchor bolts up like this. Great job guys! One great prank we like is when the masons leave huge chunks of mortar for us to chip off before starting the sill plate. Its so hard to rake wet mortar off a block or brick with your trowel.
@maritimeoutdoors
@maritimeoutdoors 3 года назад
I hated how we do foundations up where I live, until I saw this. This looks like so much work. And pricy! Using 2x12 lol.
@ethandariane5060
@ethandariane5060 3 года назад
It’s cool watching how you guys do it out in the west coast. We do things completely different in Missouri haha keep it up. We’re the same way we do foundation and all. We rough in our plumbing as well.
@braturomeo6016
@braturomeo6016 3 года назад
I belive that if you were more carefull with the digging of the trench banks you would save a truck of concrete or more from overspill.
@mikeandrade3629
@mikeandrade3629 3 года назад
Nice shots man. Appreciate the video
@BuiltByBaileys
@BuiltByBaileys Год назад
Always crazy to see how shallow footings can be in other states like Cali...always love the videos. Watching this series so I can send over to an apprentice I am mentoring in hopes of getting him his GC license down the road.
@californiadreamer3771
@californiadreamer3771 3 года назад
Awesome video!
@LongieR8er
@LongieR8er 3 года назад
Matt quick pro-tip on forming where pipes are against your form(especially on outside walls) measure 4 inches on either side of pipes.....transfer your mark onto the forms and cut vertically all the way through on a 45 degree....slap on a plywood Gussett on the outside of forms and what you’re left with is a pipe encased in 1-1/2 of concrete because of the form cut out.......also my guess is 33 yards of concrete poured, love your vids keep’M coming.
@johanntoews4840
@johanntoews4840 3 года назад
Looks good 👍
@henryvargas2915
@henryvargas2915 3 года назад
Nice job love it 👍🏽
@jbll36
@jbll36 3 года назад
Hi Matt. Crete looks good. Be able to start framing soon. The fun part. Enjoy the day. Ray L
@MrTheBurkes
@MrTheBurkes 3 года назад
At least, like, 4 yards. Awesome video, great tip with the foil sheets
@MattBangsWood
@MattBangsWood 3 года назад
Great guess.
@EliteExoticsBp
@EliteExoticsBp 3 года назад
Yep we wrap in foil too , or sleeve with plastic pipe pre cut
@sethharjo2445
@sethharjo2445 3 года назад
Learning lots of new things bro ima framer so it helps a lot man
@andrewhagler9391
@andrewhagler9391 3 года назад
57 yards +-, good work fellas
@cmiller6352
@cmiller6352 3 года назад
Nice edit when the hose tender jumped the form. Seamless.
@MattBangsWood
@MattBangsWood 3 года назад
I loved that transition. Thank you!
@Sean-ct6wr
@Sean-ct6wr 3 года назад
What’s the time stamp of that edit pls?
@jerryminyard7460
@jerryminyard7460 2 года назад
You have a good crew
@brandonjones5096
@brandonjones5096 3 года назад
So I've always wondered, taking into consideration the entire process, from digging trenches for the foundation down to installing door knobs and cabinet hinges and everything in between, what is your least favorite part of building a home? And what's your favorite? As an architect I can say my least favorite is dimensioning the plans. It's so repetitive and you really don't feel like you got much done when you finish. My favorite part is drawing the elevations. It's always the most satisfying part of the plan design for me.
@Andrewnewman11
@Andrewnewman11 3 года назад
Good pour day for sure!! Good stuff 🤘😁🤘 I think the pump is 500 plus whatever they charge a yard idk for sure.
@alfonsom2385
@alfonsom2385 3 года назад
Everyone: *has work boots on* Matt: *vans*:"man he has no idea how much a nail to the foot hurts"
@BWIL2515
@BWIL2515 3 года назад
Always great footage of your videos the drone was great i had to pump in a pour 30 years ago cost was 375 and it pissed me off
@fabianramirezfire2899
@fabianramirezfire2899 3 года назад
Cool
@floorrez308
@floorrez308 3 года назад
No 16 duplex nailes to set forms? with the Simpson hold downs tie them with tie wire wrap an 8 in them save money on screws
@amiscauich
@amiscauich 3 года назад
Dope Truewerk hoodie. Have the same one. You should try out the T2 pants. Hella comfortable
@tuckerarbuthnot9130
@tuckerarbuthnot9130 3 года назад
I’d say about 60 but hard to estimate in video! Love the series
@MattBangsWood
@MattBangsWood 3 года назад
Very good guess.
@chrishall5439
@chrishall5439 3 года назад
Mostly curious about what hammer you come back to or choose for framing!
@stephenp1717
@stephenp1717 3 года назад
Great series Matt, keep up the great work. 55 yards the the pump probably 350 an hour?
@wilkinsoncarpentry6278
@wilkinsoncarpentry6278 3 года назад
Hence the high price hire for a pump, understandably.... works out a lot cheaper than Manuel labour haha but there’s situations you have no choice but to use a pump
@nuenen75ehv76
@nuenen75ehv76 3 года назад
Boom in Holland 250 dollar and 6 dollar per kubik yard first 10 yards free
@richardbrophy4120
@richardbrophy4120 2 года назад
I wonder if a hot air balloon could be used to tie over the build and tether tarps to keep the rain out of the ditches etc might work .
@redneckgoatfarmer
@redneckgoatfarmer 3 года назад
Are these your footings and your foundation walls? Will you back fill with gravel next, insulate, poly, and then pour slab? Or are you going higher with concrete block or more concrete?
@kailebferris5145
@kailebferris5145 3 года назад
Can you do a video on how you guys do stair stringers?
@sandercurtis1847
@sandercurtis1847 Год назад
That's a lot of concrete!
@mikecox9214
@mikecox9214 3 года назад
Where did the trucks and the pump do clean outs on such a small lot?
@brettgallagher259
@brettgallagher259 3 года назад
That method seems like a lot of wasted concrete ?
@wilkinsoncarpentry6278
@wilkinsoncarpentry6278 3 года назад
Does hey I thought same but with it on that angle upto where the formwork is that’s a stronger footing
@alexsanford3697
@alexsanford3697 3 года назад
For anchor bolts, why not just wait for foundation to be poured, and then place anchor bolts after the fact.
@mertsendil6755
@mertsendil6755 3 года назад
What are the measurements in centimeters of the lumber you use on the outer and inner walls?
@steveramirez1654
@steveramirez1654 3 года назад
👍
@10abrod
@10abrod 3 года назад
I’d say around 1,110 for setup 6hr minimum for a total of around 1300 including setup and yards pumped
@nuenen75ehv76
@nuenen75ehv76 3 года назад
6h ? That's a 45min pour
@10abrod
@10abrod 3 года назад
That’s baseline for the pump showing up regardless if it’s more or less than 6 hours. Anything over would be additional p/hr
@titanicgaming202
@titanicgaming202 Год назад
Center distance of anchor bolt.
@MouseyEdits
@MouseyEdits 3 года назад
How much did it cost to have the boom pump there?
@MrTexasDan
@MrTexasDan 3 года назад
I just had a low-water crossing poured (~70 yards). The small pumper cost I think $1800 for 6 hours. I don't think they have any trouble making their $8k payment every month.
@MattBangsWood
@MattBangsWood 3 года назад
They definitely don't have issues paying it. The owner did say he got a bit uneasy with 8 units a month on payments. Nearly $100K a month needing to be paid out.
@mikeso5963
@mikeso5963 8 месяцев назад
How do you take these sticks out?
@leonelchavez4469
@leonelchavez4469 Год назад
Termites are going to have a feast with this house with all that wood they left buried 😢
@billstobie4872
@billstobie4872 7 месяцев назад
Curious what slump the concrete was?
@foxman4489
@foxman4489 2 года назад
When do you remove the forms and braces?
@jagslion3
@jagslion3 3 года назад
Always with the Coke Cola !! Lol
@MattBangsWood
@MattBangsWood 3 года назад
Clockwork. Lol
@kenduke4606
@kenduke4606 Год назад
Concrete like send is this foundation method cheaper faster then a blocks or brick foundation cause all that lumber can do a decking without plywood, lol, time spend nailing up all the lumber the brick or block foundation would of been finished and back filling and compacting stated.
@gordonclark7632
@gordonclark7632 3 года назад
That was one huge pour. Easy for me to say from Australia and not knowing anything about the subject but - I thought that the pour would have been better with the hose a bit lower so that there wasn't so much splashing over the forms. I think you Americans say - Just saying.
@stevebaker5642
@stevebaker5642 3 года назад
probably couldn't be much lower due to the overhead lines
@HippieP629
@HippieP629 3 года назад
Yea I kinda thought the same. Maybe a foot lower +shrugs+ Matt, how long's the curing time for the concrete?
@gone9677
@gone9677 3 года назад
Shut up bitch
@jimmygutierrez-solorio7928
@jimmygutierrez-solorio7928 3 года назад
How did you remove does stakes buried by the concrete? Did you break the tips off and leave the rest inside the footers?
@MattBangsWood
@MattBangsWood 3 года назад
Smack with a sledge before it sets up, they pull out.
@vitaliyzaytsev7637
@vitaliyzaytsev7637 3 года назад
Такую доску укатали в бетон, у нас бы плёнкой обернули и повторно бы использовали) а бетона та сколько лишнего в кривую траншею вылили. Все ждал посмотреть на инженерное решение узла доска-грунт, а тут все просто, лей пока везде не потечёт) Потешили ребята, хотя может вы и правы, зачем заморачиваться и экономить)
@Roy-yt2bt
@Roy-yt2bt 3 года назад
Pump truck probably is around 200 to 250 an hour?
@CARLOSGONZALEZ-kq1od
@CARLOSGONZALEZ-kq1od 10 месяцев назад
What psi was the concrete?
@andreleblanc1963
@andreleblanc1963 3 года назад
With all the slump, 32 yards
@suckslip
@suckslip 3 года назад
I counted an saw about 35
@philmoore71
@philmoore71 3 года назад
any ideas why the formwork didn't go all the way to the ground (in most places)?
@Chris_Moncada
@Chris_Moncada 3 года назад
I’m wondering this too. Guessing the slab will tie all together?
@MattBangsWood
@MattBangsWood 3 года назад
Slab will tie in together, I needed 15" wide footings. 4" cold joint from stem wall to finished floor.
@ingeniousgeneralconstructi5285
@ingeniousgeneralconstructi5285 3 года назад
Can you show this at the plans/drawing I’m confused. Why won’t you add some 2.12 in the side
@peterleishman431
@peterleishman431 3 года назад
👍🏴󠁧󠁢󠁳󠁣󠁴󠁿
@carstengrove6214
@carstengrove6214 3 года назад
23 yards
@jodyrolandconstruction6577
@jodyrolandconstruction6577 3 года назад
I’d say between 55 to 60 yards of Crete. Just curious but how much are you paying for a yard out your way? Down south we’re paying about 160 per yard.
@yadielcarrasquillo6455
@yadielcarrasquillo6455 3 года назад
We pay $165.00
@jksconstructioninc.3396
@jksconstructioninc.3396 3 года назад
Up here in Northern California we are around 145. I was thinking about 60 yards as well.
@kenactofkindness4017
@kenactofkindness4017 3 года назад
you pumped some did pour any lol that the trick question or how much u ordered in concrete go 3500 next tiime lol
@kenactofkindness4017
@kenactofkindness4017 3 года назад
3500 psi do a cylinder break test , would see 3000 gets to 4200 actual design strength
@chuckmigrain4956
@chuckmigrain4956 3 года назад
110 yards
@pawitarsingh7224
@pawitarsingh7224 3 года назад
Hi Matt, I just saw that the concrete truck says Calpoly, is this project in central coast by San Luis Obispo?
@MattBangsWood
@MattBangsWood 3 года назад
Yeah, Cal Poly is local to me.
@BryanEl24
@BryanEl24 3 года назад
6-7 trucks
@BryanEl24
@BryanEl24 3 года назад
at least 5 trucks into the footings
@rwe2156
@rwe2156 3 года назад
70 yards
@timothyhopkins9319
@timothyhopkins9319 3 года назад
62 Yards
@Timbo4413
@Timbo4413 3 года назад
How come the concrete guy didn’t pour to the top of your form boards on the first go around? Just curious
@earllll
@earllll 3 года назад
Gives the first pass a chance to set up. If you poured it all in one go the weight of the extra concrete would cause the lower section to flow out the bottom
@charlieshwan5574
@charlieshwan5574 3 года назад
What do you do with all the wood you pull off the concrete forming?
@stevebaker5642
@stevebaker5642 3 года назад
use it for the next one...?... that's what we do here ... give it a rough scrape down, then use it on the next form-work -- hell of a waste of timber otherwise.....
@gone9677
@gone9677 3 года назад
@@stevebaker5642 rofl
@clydenakashima7393
@clydenakashima7393 3 года назад
Just curious why not do a monolithic pour.
@stevebaker5642
@stevebaker5642 3 года назад
2 reasons i can think of - 1 is, what the architect/engineer specified for the soil conditions, & 2 is, the inverted T that matt poured will hold the building down better to the ground
@BryanEl24
@BryanEl24 3 года назад
1,000 for the pump
@larrywolford5686
@larrywolford5686 3 года назад
50 yards
@pedrosouza5599
@pedrosouza5599 3 года назад
How can I do to work for you guys ?
@GarlandSuseberry
@GarlandSuseberry 3 года назад
I’m going to say just about $900 for the day with another $300-600 for other fees
@ridinrancher9443
@ridinrancher9443 3 года назад
My guess is 70yds.
@omardiaz975
@omardiaz975 3 года назад
Lots of good info I liked when he got wet with the hose lol
@gordonclark7632
@gordonclark7632 3 года назад
Matt certainly picked up speed to get out of the way.
@yadielcarrasquillo6455
@yadielcarrasquillo6455 3 года назад
What is the cost per yard of concrete?
@svensvrgen6336
@svensvrgen6336 3 года назад
100 per yard typically just for the ready mix
@jerry1769
@jerry1769 3 года назад
What were you doing with that tool? The one you were dipping into the concrete.
@MattBangsWood
@MattBangsWood 3 года назад
Concrete Vibrator. Vibrates the concrete and allows it to fill voids that would otherwise leave air pockets / voids.
@ulimontiel8543
@ulimontiel8543 3 года назад
Nice
@PedroLopez-nf2st
@PedroLopez-nf2st 3 года назад
4 trucks. 40 yards
@espy7
@espy7 3 года назад
Need someone out there rodding the concrete right after its poured
@espy7
@espy7 3 года назад
Scratch that I saw the vibrator later in the video
@rubenvarela4077
@rubenvarela4077 3 года назад
13 48
@rubenvarela4077
@rubenvarela4077 3 года назад
13:48
@eveliohernandez6802
@eveliohernandez6802 3 года назад
Like all your videos...My dad was a constructor, I grew up with that....non expert, but I think with better forming can save a lot of concret....Sorry, don't want to bother you !! Just saying!!! Waiting for the next.....
@stevebaker5642
@stevebaker5642 3 года назад
I agree - an extra board or 2 around the outside would help hold this inverted T foundation in place, but perhaps harder to remove later?
@MattBangsWood
@MattBangsWood 3 года назад
No worries at all. The inside can't be formed down to the ground, my footings are required to 15" wide, which is how wide they were dug. Looks misleading, but had to be that way.
@RJ-lk5pj
@RJ-lk5pj 3 года назад
@$800 for the pump truck on this pour. 15 -20 yards for this pour
@sendit6973
@sendit6973 3 года назад
Id say probaly like 55 and great video brotha 🤙
@hellohi3970
@hellohi3970 3 года назад
In guessing you poured 90 yds
@pachecolljk
@pachecolljk 3 года назад
Why are there height limitations? Just so that houses all look the same in the neighborhood?
@stevebaker5642
@stevebaker5642 3 года назад
in New Zealand, the height laws are regards 'shadows & over-looking boundaries' - given the position this build was in regards to the others close by, maybe that's the same?
@pachecolljk
@pachecolljk 3 года назад
@@stevebaker5642 that makes sense, thanks for taking time to reply! 😁
@harryspence4562
@harryspence4562 3 года назад
75
@derekboyle6628
@derekboyle6628 3 года назад
55yds
@MattBangsWood
@MattBangsWood 3 года назад
Money guess
@cameronhill6368
@cameronhill6368 3 года назад
My Guess for the price of the pump is $300usd an hour
@johnwilimczyk4188
@johnwilimczyk4188 3 года назад
570,000.00 nah 1mill for a pumper truck cost new
@wolfpack8643
@wolfpack8643 3 года назад
Okay, that is the most Screwed up way to form and pour concrete, I have done and seen a lot, but dam it just looks like a lot of extra work with a ton of wasted concrete. The codes out in cali are F-ed UP!
@MattBangsWood
@MattBangsWood 3 года назад
When they want 15"x18" footings, they get 15x18" footings.
@MattBangsWood
@MattBangsWood 3 года назад
I'll be happy when I'm out of CA, to say the least.
@wolfpack8643
@wolfpack8643 3 года назад
@@MattBangsWood Crazy! Nice work tho, you guys are really good at building. Stay safe.
@BWIL2515
@BWIL2515 3 года назад
37yds
@yujimiller9004
@yujimiller9004 3 года назад
опалубка так себе, у нас бы за такое прилетело бы)
@Tim-Kaa
@Tim-Kaa 3 года назад
Согласен
@Kegz10
@Kegz10 3 года назад
I’m not a mason but I’m in the construction trade and that just seems like a lot of wastes concrete not have the form go lower... so you don’t have concrete filling a 2ft wide hole al the way up idk 🤷🏼‍♂️
@MattBangsWood
@MattBangsWood 3 года назад
My footings are required to be 15" wide by 18" deep, I can't have 6" by 18".. By no means is it wasted, the slab will tie in and everything goes together.
@MattBangsWood
@MattBangsWood 3 года назад
The 6" that is formed is to represent my wall and give me a cold joint to tie the finished floor into.
@Kegz10
@Kegz10 3 года назад
@@MattBangsWood gotcha thx
@ib4wp48
@ib4wp48 3 года назад
my guess is 56 yards
@arealf-ckingenious
@arealf-ckingenious 3 года назад
74 yards of concrete
Далее
One moment can change your life ✨🔄
00:32
Просмотров 13 млн
Pouring Concrete Footings Ep.31
18:25
Просмотров 808 тыс.
Stair Building Timelapse + New Favorite Tool #14
13:26
Pouring A 36'x46' Concrete Slab for Steel Building!
10:22
Laying Rebar For Our Footings
8:14
Просмотров 273 тыс.
I Made a BIG Mistake!! Footing pour
34:50
Просмотров 42 тыс.
Когда проснулась рано утром:
0:16
Il n'a pas aimé la technique 😂 #firefighter
0:13