Тёмный

Getting ready to depart of Indian Pacific Train at Sydney Central Railway Station Aus 

Подписаться
Просмотров 18 тыс.
% 84

Getting to depart of Indian Pacific Train at Sydney Central Railway Station Australia 3/08/16.
Watch the working life of The Indian Pacific Train including passengers disembarking, unloading/loading, cleaning of rail cars, shunting of rail cars and power locomotives. The train has a total of 24 carriages that day over 3 platforms.The engine first picks up the car carrying carriage then shunts back to pick-up the two remaining Passenger, Lounge and Baggage carriages.
A 4 hours long .drawn process to prepare the train for the next departure to Perth at 3pm.
4449

Авто/Мото

Опубликовано:

 

2 май 2018

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 6   
@gyanpoon63
@gyanpoon63 3 года назад
INDIAN PACIFIC GREAT TRAIN. ...👍👍👍👍
@daviddowling9830
@daviddowling9830 5 лет назад
I’ll never understand the use of one locomotive on such a challenging route. Yes,I sometimes see two but not on every train. I rode this route in my youth so long ago that steam was used beyond Kalgoorlie,made for many memories.
@turnbs
@turnbs 5 лет назад
One locomotive can adequately run the timetable with a single consist.As the train only runs once a week it is usually a double consist, which requires two locomotives to run the timetable between Sydney and Parkes, and one locomotive from Parkes onwards.
@brisbanepublictransportvlogs18
Awesome video and that rain.
@Crintingnut
@Crintingnut 2 года назад
Is that a vehicle for passenger cars at 3.08?
@beagle7622
@beagle7622 8 месяцев назад
No It’s luggage & probably food & supplies . The trip takes 3over 3 days.