Signal Point is a highly prominent 12 story purpose built building. The main entrance to the property is immediately adjacent to the Swindon Railway Station It Closed It Doors As The Signal Point In 2008 and was used buy anouther company till late 2013 and sat abandoned ever since
I Like The Old Lifts In Hear The Old DC PLC Motors Left In Hear From 1978 the logic and DC Genrators For The Lift Have Been Removed And 2 Of The Lifts Have Been Modernised Buy Euro Spec Lifts But Uses The Original Lift Cars Still
One Of The Lifts Was Stuck At The 11th Floor But Manged To Fix It Bad VFD Drive Was Showing Alarm Fault on VFD, Baicly Means There Is a Set Up Issuies With The Bace Pulse Frequency Settings Was Set To 50hz So I Changed It To 38Hz What The Motors Stated On The Vin Id Plate
DONT NOT PLAY WITH VFD DRIVES IF YOU DONT KNOW WHAT THAY DO OR HOW THAY WORK!!!
The Lifts Have Not Been Maintained Since 2013 And Are Left In A Poor State, Dogey Wiring And To Top It Off Bulding Has No Working Fire Alarms Ever !
FLOORS G - 11th Floor Otis Lifts From 1978
SPEED 1.5 M/s
Thanks For Watching
5 янв 2020