TIS PV ISOTEST - Solar PV Multifunction Performance Tester 

Test Instrument Solutions
Подписаться 637
Просмотров 1,9 тыс.
50% 1

Description:
PV-ISOTEST represents a real innovation in the panorama of PV verification and testing instrumentation. PV-ISOTEST measures the insulation resistance of a single module, a string or even an entire photovoltaic field up to 1500V DC according to IEC-EN62446 standard.
Traditional insulation meters would require a DC rated switch box to short circuit the positive and negative terminals of the module/ string/ PV field under test. With the PV-ISOTEST the use of any external device is not required, PV-ISOTEST carries out the measurements in full autonomy and self sufficiency.
In addition, through the new GFL (Ground fault locator) function, PV-ISOTEST indicates the position of any poor insulation on a string of the PV system, due for example to water or humidity leakage.
Functions
• Measurement catagory : CAT III 1500V DC / CAT III 1000V AC
• AC TRMS voltage measurements 3 ÷ 1000V
• DC voltage measurements 3 ÷ 1500V
• Insulation resistance 250, 500, 1000, 1500V
• GFL function to locate the fault position in the string
• Measurement of polarization index P.I
• Dielectric absorption ratio D.A.R
• Continuity of protective conductors with 200mA
• Size LxWxH (mm) 235mm x 165mm x 75mm
• Weight 1.2kg

Наука

Опубликовано:

 

24 июл 2023

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 2   
@jlaowens
@jlaowens 3 месяца назад
I’m testing harness’s on a PV system and my problem is when down loading data for 10 test only 4 or 5 show up being available on the ladder to the right. Rebooted the equipment and retried and then 8 show up. Is there a solution to this issue?
@testinstrumentsolutions
@testinstrumentsolutions 2 месяца назад
This came back from technical at HT Italia We can try to reduce the latency time of the COM port. To do so, with C2006 cable connected to PC and disconnected from the instrument: Device management --> COM and LPT ports -->Right button --> Properties --> Port settings --> Advanced image001.gif - Set the latency time to 1ms and press OK. Remove and replace the C2006 cable from the USB and try connecting to the instrument via topview . - If the setting fails, repeat the previous step by setting the latency time to 8ms Let us know if this works!
Далее
TIS MFTECO EV
6:14
Просмотров 1,9 тыс.
Новые iPhone 16 и 16 Pro Max
00:42
Просмотров 1,6 млн
ФОКУС С БАНАНОМ🍌
00:32
Просмотров 180 тыс.
RING FINAL CONTINUITY AM2 and/or AM2S Training
6:33
Просмотров 38 тыс.
TIS 1900 Thermal Imaging Camera
4:49
Просмотров 288
RDC-DD 6mA Testing of EVSE Charging Stations
3:38
Просмотров 4 тыс.
TIS 8000 Open jaw Multi-Tester
3:02
Просмотров 1,4 тыс.
Test the Communication Cables
1:37
Просмотров 99
How to Soldering wire in Factory ?
0:10
Просмотров 4,4 млн
Крупный ПРОВАЛ Samsung
0:48
Просмотров 621 тыс.