I need your suggestions. Please comment on what you would do with the log with the void in the middle, and the short log. Thanks in advance for your support!
Plan the side you gone finish. Blow it out with air compressor. Tape the botton with two inch tape. Pour Epoxy over holes. It'll gradually fill up the holes. The tape will keep it from running out. When all the voids are full and level with rest of slab, sand it with 220 grit. Clean with alcohol. Apply proly two more coats of Epoxy. Those larger voids will take alot of epoxy.
Thanks, those slabs should be getting about dry. I'll have to build a router sled as my planer won't be wide enough. Although, I do know a feller down the road that has a 20" grizzly planer. I assume that you level your piece to the planer by screwing various thicknesses of boards to the bottom of the slab?
Yea it needs to be level so epoxy wont run . If you could run ot thru the Grizzly to plane both sides would help flatn it. A pressure washer would get the old decay out of the holes.