The brickwork aronud the concrete linel is removed and temporary
supports installed. With much difficulty the lintel is then dragged
onto the arms of lifting gear, lowered to the ground and cut into
smaller pieces. After the longer steels have been inserted the
brickwork is restoresd.
installed. With much difficulty the lintel is dragged onto the arms of
lifting gear and lowered to the ground.
18 фев 2012